Open Sourcing Sustainable Civilization Development – One Community Weekly Progress Update #662

At One Community, we are open sourcing sustainable civilization development through comprehensive and replicable solutions for food, energy, housing, education, economics, social architecture, fulfilled living, and global stewardship practices. Created by an all-volunteer team, our work focuses on developing and free sharing every component needed to build teacher/demonstration hubs around the world. By open sourcing the complete process and evolving sustainability for The Highest Good of All, we aim to regenerate our planet and help create a world that truly works for everyone.

Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662

OUR MAIN OPEN SOURCE HUBS

Click on each icon to be taken to the corresponding Highest Good hub page.

highest good food, vegan, vegetarian, omnivore, diet, food infrastructure, hoop houses, large scale garden, food forest, botanical garden, soil amendmenthighest good energy, off-grid energy, solar power, wind power, water power, energy efficiency, hydronic, electricity, power, fuel, energy storagehighest good housing, shelter, dome home, living space, eco-housing, earthbag village, straw bale village, cob village, earth block village, shipping container village, recycled and reclaimed materials village, tree house village, duplicable city centerhighest good education, school, home school, learning, teaching, teachers, learners, curriculum, lesson plans. ultimate classroomhighest good economics, trade, money, business, transactions, resource based economy, for profit, non profit, eco tourism, revenue streams, taxes, investments, debthighest good society, social architecture, fulfilled living, pledge, values, highest good lifestyle, consensus, social equality, community contribution, recreationhighest good stewardship, for the highest good of all, vision, values, solution-based thinking model, open source model, sustainability, cultural diversity, spiritual diversity, drug policy, pet policyduplicable city center, open source city hub, laundry, dining, swimming pool, hot tub, kitchen, library, game room

One Community’s physical location will forward this movement as the first of many self-replicating teacher/demonstration communities, villages, and cities to be built around the world. This is the November 24, 2025 edition (#662) of our weekly progress update detailing our team’s development and accomplishments:

 

Open Sourcing Sustainable Civilization Development
One Community Progress Update #662

Open Sourcing Sustainable Civilization Development - One Community Weekly Progress Update #662

DONATE | COLLABORATE | HELP WITH LARGE-SCALE FUNDING

CLICK HERE IF YOU’D LIKE TO RECEIVE AN EMAIL EACH WEEK WHEN WE RELEASE A NEW UPDATE

YOU CAN ALSO JOIN US THROUGH SOCIAL MEDIA

One Community, YoutubeOne Community, LinkedInOne Community, TwitterOne Community, Facebook, UpdatesOne Community, Facebook, GroupsOne Community, Facebook, FansInstagram, Instagram icon, Instagram posts, One Community's Instagram Page, One Community Global images, Highest Good Living, green living, eco-livingOne Community, PinterestOne Community, Weekly, Progress, Updates, BlogOne Community. Tumblr

 

ONE COMMUNITY WEEKLY UPDATE DETAILS

HIGHEST GOOD HOUSING PROGRESS

Highest Good housing, cob construction, earthbag construction, straw bale construction, earthship construction, subterranean construction, sustainable homes, eco-homesOne Community is open sourcing sustainable civilization development through Highest Good housing that is artistic and beautiful, more affordable, more space efficient, lasts longer, DIY buildable, and constructed with healthy and sustainable materials:

This week, Ajay Adithiya Kumar Elancheliyan Tamilalagi (Mechanical Engineer) continued working on the ventilation system design for the Vermiculture Toilet component of the Earthbag Village. He revised his section of the report based on Jae’s feedback and performed static simulations for both models separately. He also attempted simulations on the combined structural-HVAC model using two different tools, but the meshing process was slow and unstable, so he adopted a simplified geometry as an alternative approach. Ajay gathered photos, re-simulated the UNISTRUT assembly, redesigned the side plate to incorporate HVAC, and supported Karthik’s report by reviewing prior work and updating visuals. His ongoing work continues to support open sourcing sustainable civilization development through design refinement and cross-team collaboration. Below, you’ll find some images of this work.

Highest Good Network, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update 662, ventilation system simulation, vermiculture toilet HVAC design, static FEA analysis, simplified geometry modeling, UNISTRUT assembly re-simulation, mechanical engineering report support, structural and HVAC integration, Earthbag Village ventilation project, HVAC side plate redesign, sustainable engineering workflow

Baraka Minja (Civil and Environmental Engineer Pr. Eng.) continued working on the Communal Eco-shower and Vermiculture Toilet drawings. He expanded the Duplicable City Center foundation connection concept by proposing two construction sequences—one with bolts precast in the concrete and another using bolts drilled in after the concrete had cured. He outlined the benefits and tradeoffs of each option and added a written explanation of these proposals to the connection concept draft report, contributing to open sourcing sustainable civilization development by developing adaptable and efficient structural solutions. See below for some of the pictures.

Highest Good Network, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update 662, duplicable city center foundation design, communal eco-shower drawings, vermiculture toilet drafting, civil and environmental engineering analysis, precast bolt connection, post-drilled bolt installation, construction sequence comparison, structural foundation concept report, sustainable building connection design, Earthbag Village engineering updates

Derrell Brown (Plumbing Designer) continued working on the Earthbag Village 4-dome home final MEP report by reviewing feedback from the initial draft and implementing updates across multiple sections. He advanced the report by aligning its formatting with the One Community Standards’ Clarity of Calculations section and verified the panel schedule to ensure related calculations were accurate before integrating them into the document. He also reviewed IMC code references to maintain consistency with the report’s definitions and overall narrative accuracy. His careful documentation supports open sourcing sustainable civilization development through clear, standardized reporting of sustainable system designs. See below for some pictures related to this work.

Highest Good Network, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update 662, Earthbag Village MEP report update, plumbing and electrical documentation, panel schedule verification, sustainable system calculation review, One Community Standards formatting, IMC code compliance check, mechanical and electrical coordination, building system analysis, 4 dome home engineering documentation, sustainable construction reporting

Fangting Xu (Interior Design Intern) continued working with ADA codes related to building connections for ADA 3-dome cluster of the Earthbag Village. She hosted the weekly meeting with Baraka to track tasks and progress, watched Jae’s video, provided feedback, and checked the level height. Fangting also reviewed the 2010 ADA code to confirm details for the ADA reference draft. Her focus on accessibility and precision reflects open sourcing sustainable civilization development through inclusive and compliant design standards. See below for some of the pictures related to this work.

Highest Good Network, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update 662, ADA code review, Earthbag Village 3 dome cluster design, interior design accessibility planning, weekly task coordination meeting, architectural level height check, ADA reference draft verification, inclusive design evaluation, sustainable community planning, accessible building documentation, universal design compliance

Karthik Pillai (Mechanical Engineer) continued work on the Vermiculture Toilet and 4-dome home components of the Earthbag Village. He updated the four-dome cluster roof design report based on Jae’s comments and circulated the revised version for additional feedback. He reviewed specific sections to ensure that the structural details, assumptions, and calculations aligned with project requirements and incorporated suggested changes for consistency. For the Vermiculture Toilet, he reran selected FEA simulations to obtain the necessary images for documentation and carried out design verification tasks to confirm that the structural behavior matched expected performance criteria. His detailed coordination and analytical verification exemplify open sourcing sustainable civilization development through precision-driven engineering. The related visuals are shown below.

Highest Good Network, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update 662, 4 dome cluster roof design report, structural calculation review, mechanical engineering documentation, FEA simulation updates, vermiculture toilet design verification, sustainable system engineering, collaborative report assembly, Earthbag Village project alignment, structural performance evaluation, natural building engineering

Loza Ayehutsega (Civil Engineer/Assistant Civil Engineer) worked on soil classifications, focusing on grouping soils based on their physical, chemical, and engineering properties. She resolved the file upload issue and expanded the Soil Classification section by adding a more detailed explanation of its components. She included the field classification method to align the report with required documentation standards and uploaded relevant ASTM and Unified Soil Classification System reference books to the shared storage for accessibility. Her efforts strengthen open sourcing sustainable civilization development by ensuring a well-documented and data-informed approach to geotechnical work. See below for some of the pictures related to this work.

Highest Good Network, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update 662, soil classification analysis, ASTM soil standards, unified soil classification system, civil engineering documentation, soil property evaluation, field classification method, report expansion and clarification, geotechnical reference materials, Earthbag Village soil study, engineering documentation update

Rishi Chakrapani (Mechanical Engineer) continued working on the Vermiculture Toilet. He updated the final CAD structure for the waste dumping mechanism to include a pulley, and FEA was performed on the assembly to confirm that it could withstand the applied loads. He revised the calculations report based on Jae’s feedback and reformatted the document to align with project standards. His technical updates contribute to open sourcing sustainable civilization development by improving efficiency and reliability in open-source sustainable system design. See below for some of the pictures related to this work.

Highest Good Network, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update 662, vermiculture toilet engineering, waste dumping mechanism CAD update, pulley system integration, finite element analysis FEA, load capacity verification, mechanical engineering report revision, structural calculation refinement, sustainable system design, Earthbag Village engineering update, documentation formatting improvements

 

DUPLICABLE CITY CENTER PROGRESS

duplicable city center, open source city hub, laundry, dining, swimming pool, hot tub, kitchen, library, game roomOne Community is open sourcing sustainable civilization development through a Duplicable and Sustainable City Center that is LEED Platinum certified/Sustainable, can feed 200 people at a time, provide laundry for over 300 people, is beautiful, spacious, and saves resources, money, and space:

This week, Andrew Tzu-Chien (Industrial Designer) continued working on the Duplicable City Center Dormer second-floor window. He developed the front window framing and completed the 3D modeling for the dormer window structure. He also began modifying the previous plywood layout to align with the current design, ensuring the updated structure meets the required adjustments. This open source Duplicable City Center project demonstrates open sourcing sustainable civilization development. For more details, refer to the image below.

Andrew, Duplicable City Center, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, dormer window construction, front framing development, 3D dormer visualization, sustainable architecture detailing, eco building structure design, plywood layout modification, green construction methods, environmental design engineering, climate-resilient housing concepts, structural alignment optimization

Ariana Virginia Gutierrez Doria Medina (Industrial Designer) continued working on the Duplicable City Center window and door framing by focusing on completing the design of a new structure to support the window insulation. She assembled the modified parts while addressing small gaps that could affect the insulation system and ensured each component aligned properly to maintain the intended thermal barrier. This open source Duplicable City Center project demonstrates open sourcing sustainable civilization development. See the presentation and research highlights below.

Ariana, Duplicable City Center, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, window insulation support structure design, thermal insulation gap control, sustainable window framing techniques, CAD insulation component alignment, energy-efficient window system development, eco-architecture insulation planning, structural insulation performance optimization, precision panel insulation fitting, green building thermal barrier design, modular window insulation engineering

Ayushman Dutta (Mechanical Engineer) continued working on the City Center Dome Hub Connector Engineering and DIY manufacturing. He corrected issues in the assembly spreadsheet, updated the navigation sheet, and documented the assembly process. He created instructions explaining how to navigate the spreadsheet for improved usability, updated the assembly instructions document with formatting improvements, and integrated the navigation sheet into the assembly process document. This open source Duplicable City Center project demonstrates open sourcing sustainable civilization development. Review the connector analysis visuals below for more details.

Ayushman, Duplicable City Center, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, assembly documentation workflow, spreadsheet navigation system, engineering usability improvements, structural process standardization, connector assembly guidance, collaborative manufacturing planning, technical instruction design, process clarity enhancement, mechanical workflow structuring, project documentation optimization

Bevan Chiu (Mechanical Engineer Volunteer) continued his work finishing the City Center Eco-spa Designs. He updated the plumbing pipe assembly in CAD and performed initial calculations to determine the minimum pipe spacing within the Unistrut frame assembly. Bevan also researched materials and design approaches for the plumbing access panels, focusing on options like a Baltic birch understructure and composite decking board. Additionally, he created the initial CAD model for the plumbing panels based on the proposed design concepts. This open source Duplicable City Center project contributes to open sourcing sustainable civilization development. For more details, refer to the image below.

Bevan, Duplicable City Center, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, eco-spa plumbing configuration, CAD plumbing calculations, unistrut frame spacing analysis, sustainable spa construction, plumbing access panel research, structural pipe layout design, Baltic birch panel integration, composite decking material study, spa infrastructure development, water system engineering

Koushik Chandra Katta (Mechanical Engineer) continued working on the Duplicable City Center design. He reviewed the status of all project rows, verified progress, and focused on completing updates for Rows 6 and 7. The associated files were organized and checked for alignment with expected specifications and design requirements. He prepared the updated set and submitted the files to Shreyas for integration within the project workflow. This open source Duplicable City Center project contributes to open sourcing sustainable civilization development. See the below image for detailed analysis of this work.

Koushik, Duplicable City Center, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, dome structural updates, project row validation, engineering workflow coordination, CAD file organization, structural design alignment, dome assembly progress tracking, sustainable construction engineering, collaborative design integration, technical file verification, eco infrastructure planning

Sandesh Kumawat (Mechanical Engineer) continued developing the City Center Eco-spa Designs. He revised the Unistrut-based frame structure to identify potential assembly challenges and verify structural feasibility for the Eco-Spa hot tub design. Using SolidWorks analysis, he refined the frame geometry to improve load distribution and support stable assembly while considering practical construction constraints. The updated structure was integrated with the cinder block stack foundation to form a unified hybrid base that preserves thermal mass and supports mechanical loads. Sandesh defined overall spa dimensions to optimize internal volume and initiated FEA pre-processing, configuring material properties, meshing parameters, and contact definitions to prepare for structural evaluation. Discover One Community’s open source Duplicable City Center, which exemplifies open sourcing sustainable civilization development. See the visuals below for a closer look.

Sandesh, Duplicable City Center, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Unistrut structural frame optimization, Eco-Spa load distribution refinement, SolidWorks structural simulation setup, FEA preprocessing configuration, hybrid foundation integration design, spa thermal mass engineering, mechanical load path analysis, modular spa frame feasibility, sustainable spa construction modeling, structural rigidity balancing

Srujan Pandya (Mechanical Engineer) continued his work on developing the dynamic simulation setup for earthquake analysis updates for the City Center Dome Hub Connector Engineering. He cross-verified SketchUp, DWG, and CAD dome models to identify missing components and confirm the accuracy of existing geometry. Srujan revisited previous inconsistencies, updated the review table to list all action items, and coordinated with the team to maintain workflow continuity and structured progress. The Duplicable City Center demonstrates open sourcing sustainable civilization development through open source solutions that can guide people. The images below illustrate aspects of this work.

Srujan, Duplicable City Center, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, earthquake simulation modeling, structural integrity verification, CAD geometry validation, SketchUp cross-verification process, dome connector accuracy review, dynamic simulation workflow, architectural model consistency check, engineering quality control process, design pipeline validation, seismic analysis preparation

Tianxiang Huang (Mechanical Engineer) continued working on the Duplicable City Center design. He built a simplified SolidWorks model of the hot tub to study heat conduction and estimate heat loss between the structure and the ground. He evaluated three material configurations to compare insulation performance: rock wool applied to both upper and lower sections, rock wool applied only to the lower section, and no insulation material. Results showed that adding rock wool reduced heat loss by about 55 percent. This open source Duplicable City Center project exemplifies open sourcing sustainable civilization development. For more details, refer to the image below.

Tianxiang, Duplicable City Center, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, thermal performance modeling, heat transfer evaluation, insulation efficiency testing, ground heat interaction study, eco hot tub analysis, SolidWorks simulation research, sustainable thermal engineering, rock wool performance comparison, energy conservation analysis, structural heat retention study

Vineela Reddy Pippera Badguna (Mechanical Engineer) continued contributing to the Duplicable City Center Water Catchment designs. She reviewed the recharge bed concept for integration into the City Center water catchment system and examined approaches for greener and more sustainable roads and walkways. Vineela also reviewed the Net-zero Bathroom file to understand layout and function, studied the Earthbag Village Septic Design file to understand system structure, and analyzed the Earthbag Village Water Harvesting and Conservation file to understand water collection and reuse strategies. Additionally, she reviewed Downspout Filters to understand their role in initial water screening within rainwater systems. This open source Duplicable City Center project contributes to open sourcing sustainable civilization development. See the updated rainwater catchment data and design visuals below.

Vineela, Duplicable City Center, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, water catchment system planning, rainwater filtration strategy, sustainable drainage design, eco surface roadway planning, recharge bed implementation, green infrastructure development, stormwater conservation modeling, downspout filtration analysis, low-impact water management, environmental water sustainability design

 

HIGHEST GOOD FOOD PROGRESS

sustainable food, best practice food, sustainable food systems, aquaponics, walipini, aquapini, zen aquapini, One Community, open source food, free-shared architecture, sustainable living, green living, eco living, living ecologically, for The Highest Good of All, transforming the world, grow your own food, build your own greenhouse in the ground, ground greenhouse, open source architecture, architects of the future, sustainability non-profit, 501c3 organization, sustainable life, water catchment, organic food, food anywhere, maximum food diversity, build your own farmers market, sustainability cooperative, sustainable living group, open source, sustainability nonprofit, free-shared plans, teacher/demonstration village, open source project-launch blueprinting, One Community UpdateOne Community is open sourcing sustainable civilization development through Highest Good food that is more diverse, more nutritious, locally grown and sustainable, and part of our open source botanical garden model to support and share bio-diversity:

This week, the core team continued working on the Master Tools, Equipment, and Materials and Supplies List for the Large-scale Garden, Botanical Garden, and other Highest Good Food components. The team compared the two Goat documents and the two Chicken documents to ensure consistency and completeness. Additionally, a shop document was created for TEMS, with most entries designated for use or storage in the workshop, while some can be used occasionally on other projects at different sites. The Highest Good Food initiative is a key component of One Community’s open source plans, focused on open sourcing sustainable civilization development and exemplifying the organization’s commitment through innovative design and implementation. Below are some images showcasing this work.

Core Team, Highest Good Food, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Master Tools Equipment and Materials list, sustainable garden tools, Botanical Garden resource planning, Goat and Chicken project documents, workshop tools inventory, eco-friendly agriculture supplies, Highest Good Food initiative, open source sustainability planning, regenerative project tools management, sustainable civilization development

Anuneet Kaur (Administrator) continued her focus on the design of the Transition Food Self-sufficiency Plan components of the Highest Good food initiative. She completed the Vegan Rice, Omnivore Rice, Vegan Pasta, Omnivore Pasta, Vegan Potato, Omnivore Potato, Vegan Sweet Potato, Omnivore Sweet Potato, and Transition Kitchen webpages. Anuneet ensured each page followed the updated formatting guidelines, corrected inconsistencies, and verified SEO keyword integration across all recipe sections. She also reviewed titles, spacing, and layout alignment to maintain uniformity throughout the Food Web project. Her work contributes to open sourcing sustainable civilization development.

Additionally, Anuneet ensured all team members were included in the live blog task and identified anyone who was missing. She reviewed Yulin’s infographic on sustainable research and provided detailed feedback. Anuneet fulfilled administrative responsibilities by editing summaries and collages for the Highest Good Society, Highest Good Education, and Core Teams, and reviewed fellow admin submissions for completeness and accuracy. The One Community model of open sourcing sustainable civilization development, exemplified by sustainably built classrooms and housing studies like these, fosters lasting global impact. Her recent contributions are featured in the collage below.

Anuneet, Highest Good Food, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Vegan and omnivore recipe pages, sustainable food self-sufficiency planning, Transition Kitchen webpage updates, eco-friendly recipe formatting, sustainable civilization development, open source food system design, Highest Good Food initiative, sustainable research infographic review, community food web project, One Community global sustainability

Chelsea Mariah Stellmach (Project Manager) continued working on the Transition Food Self-sufficiency food and inventory tracking software plans. She met with Ravi to review some of Tatyana’s suggestions and discuss plans for the next phase of the software mockups. Chelsea added comments to the Figma boards to support adjustments to functionality and usability. She also followed up with Ravi to obtain a new estimate for the remaining mockup work. As an essential aspect of One Community’s open source goals, the Highest Good Food initiative supports open sourcing sustainable civilization development. The following images provide a view of her contributions.

Chelsea, Highest Good Food. Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Transition Food Self-sufficiency software, kitchen inventory tracking system, sustainable food management tools, Figma UX/UI mockups, recipe and ingredient planning software, Highest Good Food initiative, open source sustainability design, eco-friendly software development, One Community sustainable civilization, regenerative food system technology

Falguni Sakpal (Volunteer Architectural Designer and Planner) continued initiating render development for the Aquapini and Walipini Master Plan of the Highest Good Food initiative. She worked on the Aquapini and Walipini Master Plan and related website content updates, reviewing assigned sections across all three main documents and responding to comments from Jae and Shivangi to clarify rendering expectations for plans, elevations, and sections. Her work supports open sourcing sustainable civilization development by strengthening the visual clarity and consistency of these open-source resources. She gathered visual references for the rendering style, studied existing plan and section examples, and reviewed the original AutoCAD base files to understand layer organization and drawing structure.

Falguni exported and cleaned the required plan layers, set up the rendering workflow, and began the first draft of the rendered plan. The work focused on establishing a consistent visual approach for the upcoming base renderings while ensuring alignment with One Community’s documentation and formatting standards. The Highest Good Food initiative is a key part of One Community’s open source platform, focused on sustainable and participatory development while open sourcing sustainable civilization development. See below for pictures related to this work.

Falguni ,Highest Good Food , Open Sourcing Sustainable Civilization Development , One Community Weekly Progress Update #662, Aquapini and Walipini masterplan rendering, sustainable greenhouse design visualization, AutoCAD plan layer cleanup, architectural rendering workflow, eco-friendly landscape and structure graphics, Highest Good Food initiative, One Community open source development, sustainable civilization planning, regenerative agriculture render setup, participatory design documentation

Gayatri Pandkar (Architect) continued writing content for the various components of the Aquapini and Walipini aspects of the Highest Good Food initiative. She worked on designing the people space for the Walipini 3 structure by reviewing the layout and identifying needed elements. Gayatri gathered the SketchUp plants and trees from the project list, prepared them for the model, placed selected trees in the SketchUp model, and continued developing the concept design sketch with the main layout ideas. The Highest Good Food initiative is a key part of One Community’s open source platform, focused on sustainable and participatory development while open sourcing sustainable civilization development. Visual examples from her work are presented below.

Gayatri, Highest Good Food, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Walipini 3 people space design, sustainable greenhouse layout, SketchUp plant and tree placement, regenerative agriculture modeling, eco-friendly landscape design, Aquapini and Walipini planning, Highest Good Food initiative, open source sustainable civilization, participatory ecological design, One Community regenerative development

Japneet Kour (Volunteer Architect) continued contributing to the Highest Good Food initiative. She compiled the diversity of plants from the previous SketchUp file into the current Walipini 1 file, added more plant diversity based on feedback, reviewed the placement of specific plant groups to align with project requirements, and corrected multiple elements in the SketchUp model for Walipini #1, the Frost-Free Arid Zone Desert House. The Highest Good Food initiative is a key part of One Community’s open source platform, focused on sustainable and participatory development while open sourcing sustainable civilization development. Visual examples from her work are presented below.

Japneet, Highest Good Food, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Walipini 1 plant diversity update, sustainable greenhouse planting design, SketchUp model corrections, Frost-Free Arid Zone Desert House plants, regenerative agriculture layout, eco-friendly landscape modeling, Highest Good Food initiative, One Community open source sustainability, participatory ecological design, sustainable civilization development

Jay Nair (BIM Designer) continued developing the Aquapini and Walipini Planting and Harvesting documents. He worked on the lighting energy calculation for Walipini 1, updating the data and verifying the figures for each zone. Jay also standardized the document’s format, organized sections, refined headings, and ensured consistency so the document aligns with project presentation standards. The Highest Good Food initiative is a key part of One Community’s open source platform, focused on sustainable and participatory development while open sourcing sustainable civilization development. See below for pictures related to this work.

Jay, Highest Good Food, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Walipini 1 lighting energy calculation, sustainable greenhouse lighting design, Aquapini and Walipini documentation, energy-efficient greenhouse zones, regenerative agriculture planning, eco-friendly lighting analysis, Highest Good Food initiative, One Community open source sustainability, participatory ecological development, sustainable civilization design

Nitin Parate (Architect) continued contributing to the Aquapini and Walipini renders and layout graphics. Nitin focused on the Walipini 3 plan, reviewing the layout and planting scheme to understand design requirements. Required JPG and PDF files were extracted and organized for the next stages of production and rendering. The base layer for the plan was prepared, and different planting layers were applied to build the layout and align it with the project’s planting scheme. The Highest Good Food initiative is a key part of One Community’s open source platform, promoting regenerative and participatory development while open sourcing sustainable civilization development. Images below showcase his contributions.

Nitin, Highest Good Food, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Walipini 3 planting plan, sustainable greenhouse rendering, regenerative planting layout, eco-friendly landscape design, Aquapini and Walipini renders, sustainable agriculture graphics, Highest Good Food initiative, open source ecological design, One Community sustainable civilization, participatory regenerative development

Pallavi Deshmukh (Software Engineer) continued working on the Aquapini and Walipini Planting and Harvesting web details. She updated the Walipini #2 page with content provided by Silin and Junyi Shi, including revisions to text, links, and images, before submitting the updated version for Jae’s review. Pallavi completed the Walipini #2 updates and continued work on Walipini #1 and Zenapini #2 using content from Gayatri. She created new content for Blog 661, incorporated feedback from teammates, and scheduled interviews for the upcoming week. In alignment with One Community’s open source objectives, the Highest Good Food project integrates open sourcing sustainable civilization development into a larger vision of regenerative living. Her contributions are highlighted in the collage below.

Pallavi, Highest Good Food, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Walipini and Zenapini greenhouse updates, sustainable planting and harvesting pages, eco-friendly agriculture content, regenerative living documentation, open source food system development, sustainable civilization design, Aquapini and Walipini web updates, greenhouse layout refinement, One Community sustainability work, collaborative eco-infrastructure content

Ravi Kumar Sripathi (Software Engineer) continued developing the Food Procurement and Storage software platform, enhancing features related to inventory tracking, recipe management, and food utilization. Ravi expanded the inventory, agriculture, and animal-management workflows to improve tracking and production planning across the One Community hub. His updates support open sourcing sustainable civilization development by improving transparency and usability in food-management systems. He developed a pie chart visualization showing how harvested ingredients are used and outlined updates for the animal-management system, including buttons to order feed, supplemental nutrition, and other supplies needed for breeding, illness, and general care. Progress was also made on a financial tracking feature comparing animal output to the cost of raising them. Work continued on produce processing features, including recipe pathways for turning surplus meat into tallow, jerky, and other preserved items, aligning with existing harvest-processing tools. The Highest Good Food initiative is a key part of One Community’s open source platform, focused on sustainable and participatory development while open sourcing sustainable civilization development. See below for pictures related to this work.

Ravi, Highest Good Food, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Food procurement software, sustainable inventory tracking, recipe and harvest management tools, livestock management workflow, agricultural production planning, pie chart food utilization visualization, sustainable livestock cost analysis, surplus meat processing pathways, Highest Good Food initiative, open sourcing sustainable civilization development

Shivangi Varma (Architectural Designer and Planner) continued the redesign of the Highest Good Food overall presentation, currently focused on the Aquapini and Walipini masterplan render. She updated the masterplan render based on Loom video feedback and detailed the Aquapini, Walipini, and Zenipini structural layout renders by adding plant and passage details. Shivangi refined the Aquapini masterplan using the 2D layout and plant lists, and developed the Zenipini interior layout showing the extent of green landscape and planting beds. The Highest Good Food initiative plays a leading role in One Community’s open source platform by promoting sustainable and participatory development, focused on open sourcing sustainable civilization development. Below are visuals highlighting this work.

Shivangi, Highest Good Food, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Aquapini and Walipini masterplan render, Zenipini interior landscape design, sustainable greenhouse layout, regenerative food infrastructure, plant and passage detailing, eco-friendly architectural visualization, Highest Good Food initiative, One Community open source development, sustainable civilization design, participatory ecological planning

 

HIGHEST GOOD ENERGY PROGRESS

highest good energy, off-grid energy, solar power, wind power, water power, energy efficiency, hydronic, electricity, power, fuel, energy storageOne Community is open sourcing sustainable civilization development through Highest Good energy that is more sustainable, resilient, supports self-sufficiency and includes solar, wind, hydro and more:

This week, the core team continued contributing to the Highest Good Energy initiative. They worked on the Energy Needs Analysis Spreadsheet by locating several energy-related pages, verifying values where possible, and adding copies of the information to the primary document. The core team corrected a number of entries, checked that all linked cells functioned as intended, and applied formatting adjustments to clearly distinguish needs tables from cost tables. The Highest Good Energy initiative plays a leading role in One Community’s open source platform by promoting sustainable and participatory development, focused on open sourcing sustainable civilization development. Below are images related to this project.

Core Team, Highest Good Energy, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Energy Needs Analysis Spreadsheet, sustainable energy planning, renewable power requirements, off-grid energy evaluation, energy cost and needs tables, Highest Good Energy initiative, open source sustainability tools, regenerative energy system design, One Community sustainable development, open sourcing sustainable civilization development

 

HIGHEST GOOD EDUCATION PROGRESS

One Community school, One Community education, teaching strategies for life, curriculum for life, One Community, transformational education, open source education, free-shared education, eco-education, curriculum for life, strategies of leadership, the ultimate classroom, teaching tools for life, for the highest good of all, Waldorf, Study Technology, Study Tech, Montessori, Reggio, 8 Intelligences, Bloom's Taxonomy, Orff, our children are our future, the future of kids, One Community kids, One Community families, education for life, transformational livingOne Community is open sourcing sustainable civilization development through Highest Good education that is for all ages, applicable in any environment, adaptable to individual needs, far exceeds traditional education standards, and more fun for both the teachers and the students. This component of One Community is about 95% complete with only the Open Source School Licensing and Ultimate Classroom construction and assembly details remaining to be finished.

With over 8 years of work invested in the process, the sections below are all complete until we move onto the property and continue the development and open sourcing process with teachers and students – a development process that is built directly into the structure of the education program and everything else we’re creating too:

This week, Prudhvi Marpina (Data Analyst) continued developing the Highest Good Education software platform, concentrating on Phase 4: marketing, promotion, and administrative activities. He worked on HGN Phase 4 software management by sending Slack messages to developers for updates on pending tasks, reviewing Deliverable 2 action items to check pull request titles and labels, updating Figma images, and assigning hours for newly claimed tasks. He also updated Jae on pull requests needing changes and communicated label corrections to developers.

As part of the marketing and promotion work, Prudhvi updated the weekly tracker data in the social media dashboard and Bluesky sheets, reviewed last week’s analytics, and scheduled next week’s posts in Buffer. In addition, he contributed to OC Administration by updating Blog 661, reviewing each admin’s weekly contributions, and making updates in the blog and summaries document. Through these activities, he supported One Community’s commitment to open sourcing sustainable civilization development. The images below highlight his contributions.

Highest Good Education, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, HGN Phase 4 software management, developer task updates, pull request reviews, Figma image updates, marketing and promotion workflow, social media analytics tracking, Buffer post scheduling, OC Administration updates, weekly blog contributions, project management coordination

 

HIGHEST GOOD SOCIETY PROGRESS

a new way to life, living fulfilled, an enriching life, enriched life, fulfilled life, ascension, evolving consciousness, loving lifeOne Community is open sourcing sustainable civilization development through a Highest Good society approach to living that is founded on fulfilled living, the study of meeting human needs, Community, and making a difference in the world:

This week, the core team completed over 42 hours managing volunteer work reviews, handling emails, overseeing social media accounts, supporting web development, identifying new bugs, and integrating bug fixes for the Highest Good Network software. They also interviewed and onboarded new volunteer team members. Additionally, they produced and integrated the video above, which highlights how open sourcing sustainable civilization development serves as the foundation of One Community’s broader mission. The following images showcase highlights of this work.

Core Team, Volunteer Work Review, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, volunteer work management, social media oversight, web development support, bug identification and fixes, Highest Good Network software, volunteer onboarding process, sustainable civilization development, open source project contribution, One Community mission, weekly team productivity

Jaiwanth Reddy Adavalli (Project Manager) continued developing the Job Applicants page and key components of the Highest Good Network. He tracked updates in the software team management documents to assign, monitor, and support task status. Jaiwanth also worked on the Phase 2 and Phase 3 Dashboards by testing multiple components in the HGN software and creating new action items to develop additional features. As a member of the pull request review team, he reviewed submissions from the volunteer team assigned to him. This work supports One Community’s commitment to open sourcing sustainable civilization development. The images below highlight his contributions.

Highest Good Society, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Phase 2 dashboard testing, Phase 3 dashboard development, HGN software components, new action item creation, software task management, developer update tracking, pull request review process, volunteer developer submissions, software quality assurance, dashboard component testing

Yagna Reddy Badvel (Data Analyst and Team Administrator) continued working on the Summary Dashboards and Weekly Report page on the Highest Good Network. He completed a full audit of the Phase 2 “Materials, Equipment, Tools, and Project Tracking System” tab in the HGN Bugs & Features sheet, checking for missing fields, incorrect dropdown usage, outdated status values, and ensuring escalation levels were marked correctly for urgent tasks. He also fixed formatting inconsistencies, cleaned up broken or duplicated Google Doc bookmark links, refined task descriptions, and updated filtering logic to match the current project structure.

In addition to Phase 2 tracking, Yagna completed his regular admin responsibilities by reviewing volunteer summaries for formatting and accuracy, checking media folders, adding tracking tables where needed, providing feedback through the weekly reporting process, verifying SEO and image requirements, updating WordPress entries, coordinating fixes before the deadline, and organizing folders and documents for the next cycle. This work supports One Community’s commitment to open sourcing sustainable civilization development. The images below highlight his contributions.

Highest Good Society, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Phase 2 project tracking audit, HGN Bugs and Features sheet, task escalation validation, Google Doc bookmark cleanup, project filtering logic update, volunteer summary review, SEO and image verification, WordPress content updates, admin workflow management, project documentation organization

ADMINISTRATION TEAM

The Administration Team’s summary, which covers their work on the Highest Good Network, was managed by Prudhvi Marpina (Data Analyst) and includes Anusha Gali (Software Engineer), Ashutosh Mishra (Software Engineer), Divanshu Bakshi (Team Admin), Indra Anuraag Gade (Software Engineer and Team Administrator), Keerthana Chitturi (System Administrator), Mridul Bhushan (Volunteer Project Strategy Analyst and Team Administrator), Neeharika Kamireddy (Data Analyst), Olawunmi “Ola” Ijisesan (Administrative and Management Support), Olimpia Borgohain (Data Analyst and Team Administrator), Priyanshi Sharma (Data Analyst and Team Administrator), Rachna Malav (Data Analyst), Rajeshwari Bhirud (Administrator), Rishitha Adepu (Administrator), Sai Suraj Matta Veera Venkata (Business Data Analyst), Sayantan Paul (Volunteer Frontend Tester and Software Team Administrator), and Sudarshan Raju Chintalapati Venkata (Data Analyst). The Administration Team supports the Highest Good Network, a tool designed to track and measure progress while developing systems that contribute to open sourcing sustainable civilization development. Through administrative support, documentation, testing, training, recruiting, analytics, and content management, the team helps advance this mission, aligning with One Community’s vision of building a replicable and sustainable future model.

This week, Anusha completed Level 2 testing across the HGN and HGNRest systems, validating dozens of pull requests, requesting updates for UI, backend, and functional issues, updating tracking files, and supporting administrative workflows. Ashutosh optimized latency for the 3D virtual assistant by improving caching logic, added new API endpoints, completed Timelog Administrator tasks, tested multiple models, and advanced LCEL-related features. As part of this work, he contributed to open sourcing sustainable civilization development by strengthening infrastructure that supports wider system reliability. Divanshu processed Mastodon analytics with Python scripts, updated the Master Data sheet and Volunteer Tracker, posted four Mastodon updates, and documented two platform-related issues.

Indra completed Blog #661 for the Code Crafters Team, updated Twitter analytics, built an ML pipeline with 12 models and 18 engineered features, produced technical documentation, and contributed new items to the Bugs & Features tracker. Keerthana reviewed weekly summaries, updated Step 2 and Step 4 documents, prepared the weekly blog, and added Phase 3 action items. Mridul refined Moonfall Team submissions, prepared collage alt text, finalized the WordPress blog version, reviewed Sudarshan’s admin submission, and validated HGN Phase 2 document entries while strengthening content that supports open sourcing sustainable civilization development.

Neeharika coordinated software team tasks, followed up on assignments, tested multiple pull requests, logged new bugs, completed admin duties, and verified updates in corrected documents. Ola prepared administrative folders, organized workspaces, managed Pinterest scheduling, created new content, and uploaded her weekly tasks with images. Olimpia updated LinkedIn analytics KPIs, completed senior admin review checks, resolved documentation comments, handled warnings and blue square notifications, and scheduled next week’s LinkedIn posts. Priyanshi continued Phase 2 PR testing, identifying chart and filter issues, verifying dashboard logic, documenting findings, and refining her testing process. Rachna reviewed older tasks, emails, and SEO pages and monitored hiring workflow activity. Rajeshwari managed Blog #661 administration by reviewing summaries, providing feedback, updating SEO content, and documenting detailed HGN Dashboard test cases, helping reinforce content aligned with open sourcing sustainable civilization development.

Rishitha updated bios, uploaded Threads content, added raw data to the dashboard, updated the volunteer tracker, and created documentation and videos. Sai Suraj completed Facebook and Instagram analytics updates, built training materials for the Volunteers Guide hub, scheduled content, maintained documentation, and completed administrative work. Sayantan continued Level 1 testing across multiple PRs, verified frontend and dashboard behaviors, and reported Team Skye’s weekly contributions. Sudarshan managed the Alpha Software Team blog, completed SEO and collage updates, reviewed Phase 2 PRs, added new tasks for bugs and enhancements, validated dashboard data, and tested merged PRs 4254, 4277, and 4253. To learn more about how this work supports One Community’s vision of open sourcing sustainable civilization development, visit the Highest Good Society and Highest Good Network pages. Highlights of the team’s contributions are shown in the collage below.

Admin Team, Highest Good Network Software, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, Highest Good Network updates, software testing and QA, Mastodon analytics reporting, machine learning pipeline development, WordPress blog management, administrative workflow support, LinkedIn KPI tracking, Phase 2 frontend testing, dashboard data validation, sustainable development project management

GRAPHIC DESIGN TEAM

The Graphic Design Team’s summary includes Qinyi Liu (Graphic Designer), and Yulin Li (Graphic Designer) who focused this week on creating graphic designs that support open sourcing sustainable civilization development.

This week, Qinyi created and refined AI-generated characters, updated posters and social media images, and revised earlier designs for visual consistency. She also compared multiple generation tools for open sourcing sustainable civilization development, noting differences in their ability to interpret reference images and maintain a consistent art style. Yulin revised five social media images based on feedback, posted a software team collaboration announcement, managed shared assets, and participated in review discussions for open sourcing sustainable civilization development. She used these efforts to support visual communication and coordination tasks. Their work highlights open sourcing sustainable civilization development. See the Highest Good Society pages and the collage below for examples of their work.

Graphics Design, Highest Good Network, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update 662, visual design updates, ai-generated characters, social media graphics, poster redesign, content refinement, ai image generation tools, visual communication workflow, sustainability-focused design, team collaboration announcement, shared asset management

HIGHEST GOOD NETWORK PROGRESS

Highest Good Network® Application, improving city efficiency, creating the world we wantOne Community is open sourcing sustainable civilization development through open source Highest Good Network® software that is a web-based application for collaboration, time tracking, and objective data collection. The purpose of the Highest Good Network is to provide software for internal operations and external cooperation. It is being designed for global use in support of the different countries and communities replicating the One Community sustainable village models and related components.

  • Learn about our open source community collaboration, open sourcing sustainable civilization development, and management software: The Highest Good Network

This week, the core team tested HGN pull requests and confirmed 10 fixed PRs. This effort highlights One Community’s commitment to open sourcing sustainable civilization development.

The following PRs were not fixed: the Blue Square CC feature, the specific application page template form for the application and job posting page, the added counter on the CC list button for Blue Square, and the dark mode update for analytics with invalid date range handling. The team was not able to test the Job Posting Page Analytics frontend PR, which creates a horizontal bar graph showing the hits-to-applications ratio, because there was no data on the Main branch. This work strengthens One Community’s mission of open sourcing sustainable civilization development. See the Highest Good Society and The Highest Good Network pages, and the collage below, for an overview of the team’s contributions.

Core Team, HGN PR Testing, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, HGN pull request testing, Blue Square CC feature, application page template issues, job posting page template form, CC list button counter, dark mode analytics update, invalid date range handling, frontend analytics testing, hits-to-applications ratio graph, Main branch data availability

ALPHA SOFTWARE DEVELOPMENT TEAM

The Alpha Software Team, working on the Highest Good Network software, was managed by Lin Khant Htel (Frontend Software Developer). The team includes Maneesh Buddha (Software Developer) and Nikita Kolla (Full Stack Developer). The Highest Good Network software is a key part of sustainable and free-shared eco-solutions, helping track and measure progress toward open sourcing sustainable civilization development. The software supports social architecture, construction, production, and maintenance processes that contribute to the open source project and resilient ecosystems. Designed to be portable and scalable, the Highest Good Network software is well suited for off-grid and sustainable living communities. This project reflects One Community’s open source commitment to advancing the idea of open sourcing sustainable civilization development.

This week, Maneesh worked on the Select Category filter issue in the Job Posting page by identifying why the list displayed no categories and adjusting the frontend logic to ensure the data loaded correctly. His troubleshooting process also aligns with open sourcing sustainable civilization development by strengthening the reliability of shared systems. He also focused on the reorder function for job items by reviewing the save logic, checking the API request behavior, examining the authorization header handling, preparing a separate branch to isolate the changes, testing the related components, and gathering screenshots to document his progress.

Nikita addressed skill gaps in MongoDB while resolving issues in the codebase by analyzing how tests interacted with the database and identifying conditions that caused certain logic paths to be skipped, which affected expected test outcomes. During this work, she encountered an additional issue related to core team missed hours, highlighted by an error indicating that a MongoDB lookup using a pipeline could not specify both localField and foreignField, which guided further debugging of the core team additional hours logic. See the Highest Good Society and Highest Good Network pages for more on how this contributed to the idea of open sourcing sustainable civilization development. See the collage below to view the team’s work.

Team Alpha, Highest Good Network Software, Open Sourcing Sustainable Civilization Development, One Community, Weekly Progress Update #662, Select Category filter, job posting page update, frontend logic fix, job item reorder function, API request debugging, MongoDB test analysis, database logic issue, core team hours debugging, pipeline lookup error, codebase troubleshooting

BINARY BRIGADE SOFTWARE DEVELOPMENT TEAM

The Binary Brigade Team, presenting their work on the Highest Good Network software, was managed by Nikhil Routh (Software Engineer) and included Kanishk Agarwal (Software Engineer), Apoorva Jain Ramapura Prashanth (Software Engineer), Deep Shah (Software Engineer), Ramsundar Konety Govindarajan (Software Engineer), Harsha Rudhraraju (Software Engineer), Xinyi Zhou (Developer), Sourabh Bagde (Software Developer), Taariq Mansurie (Full-Stack Developer), Sumedh Kumar (Full-Stack Developer), Aswin “Tony” Kanikairaj (Software Engineer), and Amalesh Arivanan (Software Engineer). The Highest Good Network software is our tool for managing and objectively measuring progress, ensuring that all contributions are tracked and aligned with our mission, modeling, and open sourcing sustainable civilization development.

This week, Amalesh implemented the Phase 2 Summary Dashboard with responsive KPI tiles, a weekly tasks line chart, date range filtering, backend integration for task grouping and KPI aggregation, timezone handling, and error handling, and also resolved merge conflicts related to the duplicate task feature and scheduling controller while documenting and tracking his work. Apoorva updated the email templates UI by moving from card-based layouts to a tabbed interface, fixed image uploads in TinyMCE, optimized search debounce behavior, added client-side sorting, and investigated a blank email issue by tracing HTML flow and identifying backend authentication errors as the cause while preparing a fresh development setup. Aswin completed Phase 3 Visualization work by adding routing and subpages to the Participation Report, restoring and fixing the calendar layout with event indicators, resolving dark mode visibility issues, building comparative charts, converting remaining global CSS to modules, and validating workflow behavior across components, contributing to overall progress aligned with open sourcing sustainable civilization development.

Deep fixed chart legend visibility and dark mode theming issues, addressed low-contrast and rerender problems after theme changes, and corrected the “Belongs to” selector behavior to stop auto-adding tags while pending further backend testing. Harshavarma developed calendar views for month, week, and day, added an interactive add-task popup, improved responsive layouts, handled overlapping event rendering, aligned UI with existing styles, and prepared hooks for future backend integration while validating edge cases. Kanishk integrated backend and frontend for the Attendance and No-Show Tracking System, resolved a MongoDB connection string issue, reviewed the Event model and filtering APIs, and built the database design page with event cards and routing. Nikhil progressed the CSS Modules migration across multiple components, reviewed related PRs, validated backend fixes for MongoDB timeouts, helped define backend data flow and database structure for a new feature, and assisted in analyzing a production data deletion incident by contributing to root cause identification and suggesting DB audit monitoring and real-time deletion alerts as part of broader efforts supporting open sourcing sustainable civilization development.

Ram addressed review comments on the PR Review Team Analytics Dashboard, worked through merge conflicts in older PRs, investigated a UI issue where usage records were not rendering despite valid API responses, and encountered development branch access errors. Sourabh enhanced the MySpace auto-poster by fixing scheduling logic to prevent post overwrites, improving dark mode styling, validating form fields, and aligning the scheduling UI with the intended design. Sumedh added a Material Usage Record doughnut chart to the BM Dashboard with associated UI integration and styling, submitted a pull request, and continued investigating an API issue in the DailyActivity Log while resolving dark mode bugs. Taariq fixed filter issues on refresh, resolved merge conflicts and lint problems related to a node upgrade, advanced updates to weekly summary email user logic, tested email functionality, investigated permission page UI inconsistencies, and prepared archived projects changes for review. Xinyi fixed the “view issues” button routing, updated the dropdown menu to include and format the Team option, improved dark mode compatibility, addressed review feedback, and reviewed teammates’ pull requests. See the Highest Good Society and Highest Good Network pages for more information on how this work models open sourcing sustainable civilization development. The collage below shows images of their work.

binary brigade, highest good network software, open sourcing sustainable civilization development, one community weekly progress #662, dashboard development, dark mode fixes, calendar UI enhancements, MongoDB backend integration, CSS modules migration, task scheduling improvements, email template updates, data visualization charts, participation report features, responsive UI design

BLUE STEEL SOFTWARE DEVELOPMENT TEAM

The Blue Steel Software Team, working on the Highest Good Network software, was managed by Divanshu Bakshi (Product Manager), and includes Linh Huynh (Software Engineer), Som Ramnani (Software Engineer), and Sheetal Mangate (Software Engineer). This week, Linh focused on the educator-side feature for displaying the list of finished tasks reported by students, reviewing backend and frontend structures related to the task submissions list as part of open sourcing sustainable civilization development. He analyzed endpoint behavior and confirmed how student submissions populate the dynamic table. He examined the returned fields required for the educator view, including student name, task name, submission type, submission status, submission date, and review links. Linh also reviewed query filters for status, student, and course to determine how they should integrate with the UI layout. Additionally, he evaluated prior developer changes, identified areas requiring correction, verified routing expectations, and prepared the project for implementing logic to detect and tag late submissions so the interface can properly load, filter, and display student task completion records.

Som worked on PR 4228 to fix a Figma mismatch in the CPDashboard by adding the missing “Ending After” date picker to the search filters, implementing state management to handle the selected date, resolving UI inconsistencies on the live site, and creating the related PR. He also revisited PR 4215 to resolve merge conflicts in package.json and yarn.lock caused by unintended dependency upgrades from npm. Som reverted both files to correct versions, reinstalled node modules, and switched the workflow from npm to yarn to maintain consistent lockfile behavior and align dependencies with development. Sheetal explored Bitwarden for storing secrets and API keys. She created an account, added secrets for Reddit, reviewed the developer guide for retrieving stored values, and committed code for the frontend autoposter. She encountered a block due to a Husky pre-commit hook, bypassed the issue using the no-verify option, and reported continued difficulty with the commit process despite messages indicating all checks passed, while continuing efforts aligned with open sourcing sustainable civilization development.

Team Blue Steel, Highest Good Network Software, open sourcing sustainable civilization development 662, sustainability, software, development, integration, backend, frontend, network, configuration, notification, Environment, Ecological

 

CODE CRAFTERS SOFTWARE DEVELOPMENT TEAM

The Code Crafters Team, covering their work on the Highest Good Network software, was managed by Vivek Chandra (Software Engineer) and includes Ajay Naidu (Software Engineer), Akshith Kumar Reddy Balappagari Gnaneswara (Software Engineer – Full Stack), Juhitha Reddy Penumalli (Software Engineer), Sphurthy Satish (Software Engineer). The Highest Good Network software is how we’ll manage and objectively measure our progress in open sourcing sustainable civilization development through our social architecture, construction, production, and maintenance efforts, while supporting widespread and lasting eco-lifestyle access.

This week, Ajay refined chart behavior by adjusting data label rendering to prevent overlap when viewing all projects, corrected label display when switching between cost and percentage values, verified the updates against requested features, pushed the changes to a new branch, addressed failing checks, and added a clickable magnifying-glass search icon to improve search visibility and usability. Akshith continued work on the Phase 4 PM Educator Training Dashboard frontend, implementing database-driven functionality to make the dashboard dynamic, ensuring certification profile updates appear accurately across systems, and reviewing various interaction scenarios.

Juhitha worked across Phase 4 and Phase 2, implementing the Task Progress Indicator, preparing pull requests, refining dashboard visuals, integrating mock data with student progress components, and updating routing and tab structures for the Project Manager Resource Management Dashboard. Sphurthy completed analytics backend integration for the HGNRest application, creating a StudentMetrics model, building a service to compute and cache metrics, implementing endpoints for cluster-wide and per-student analytics, adding a daily cron job, and updating server files. Vivek developed the controller to retrieve task change logs, created a component for resolved tasks requiring backend integration, investigated API issues, and updated the README for the education portal. These contributions strengthen One Community’s mission and commitment to open sourcing sustainable civilization development. The collage below shows an overview of this team’s work.

Code Crafters, Highest Good Network Software, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, project management dashboard development, frontend and backend feature implementation, data visualization enhancements, analytics backend integration, dynamic educator training dashboard, student metrics analytics, API endpoint development, UI/UX component updates, chart rendering optimization, software development progress report

DEV DYNASTY SOFTWARE DEVELOPMENT TEAM

The Dev Dynasty Team’s summary, covering their work on the Highest Good Network software, was managed by Prem Vora (Software Developer) and includes Adithya Cherukuri (Volunteer Software Engineer), Aditya Gambhir (Software Engineer), Deekshith Kumar Singirikonda (Developer), Manvitha Yeeli (Software Engineer), Nahiyan Ahmed (Full-Stack Software Developer), Sriamsh Reddy (Software Engineer), Neeraj Kondaveeti (Software Engineer) and Vamsidhar Panithi (Software Engineer). The Highest Good Network software is how we’ll manage and objectively measure our processes for open sourcing a better world through social architecture, construction, production, and maintenance processes. This progress supports One Community in open sourcing sustainable civilization development.

This week, Nahiyan reviewed PR 4427 to validate dark mode behavior in the Building and Inventory Management Dashboard by checking theme toggling, layout consistency, and alignment with the existing code structure. Adithya worked on backend and frontend components for Job Posting Analytics and the Listing and Bidding Platform by completing aggregation logic, caching for enhanced role-based visualization, implementing chart integration, and preparing and running payment creation tests. Aditya carried out quality assurance across multiple areas by reviewing frontend and backend pull requests for the Skills module, Paid Labor Cost chart, and project components, testing dark mode behavior, analyzing API activity, and identifying issues with date filters, cost display, and data flow. Deekshith developed authentication and analytics components by implementing PermissionWatcher for session monitoring, useCountdown for forced logout handling, and AttendanceStatistics for visualizing event data with Recharts and Redux integration.

Manvitha completed the Student Dashboard Timer and Resource Request backend module by building timer controls, fixing synchronization and display issues, integrating backend API actions, and implementing educator and project manager request workflows with validation, authorization, and filtering. Prem also worked on the Student Dashboard Timer and Resource Request backend module by building a countdown system with start, pause, resume, reset, and adjustment functions, resolving alignment and synchronization issues, integrating API connections for timer actions, and adding backend endpoints for request creation, retrieval, and updates with role-based authorization. Sriamsh implemented backend and frontend components for the Production-Linked Dev Account creation feature, including an endpoint for identity verification, validation logic, password hashing, an audit log system with timestamps and IP tracking, and frontend validation and error handling for the new signup interface. Vamsidhar improved dark mode compatibility across dashboard components by updating the Supplier Performance Graph and Project Status Donut Chart, adjusting background, label, and legend behavior, resolving layout and responsiveness issues, and completing related work under PRs 3405 and 3469. See the Highest Good Society and Highest Good Network pages for more on how this relates to our mission of open sourcing sustainable civilization development. Explore some of the team’s work in the collage below.

Dev Dynasty, Highest Good Network Software, Highest Good Future Building, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, dark mode validation, role-based analytics, dashboard theme toggling, backend aggregation logic, frontend pull request testing, authentication and session monitoring, student dashboard timer, resource request workflow, community calendar filters, production-linked account creation

EXPRESSERS SOFTWARE DEVELOPMENT TEAM

The Expressers Team’s summary, which covers their work on the Highest Good Network, was managed by Rahul Trivedi (Software Engineer) and includes Casstiel Pi (Software Engineer), and Meenashi Jeyanthinatha (Full-Stack Developer). This contribution supports One Community’s mission of open sourcing sustainable civilization development. This week, Casstiel finished the pull request for the “Fix Legend Color Change Bug on Injury Severity by Projects Chart” and began addressing a new issue: fixing a page error triggered when clicking lesson elements, including adding dark mode support. Analysis of the error logs identified that the Tooltip component was not receiving valid active, payload, or label props, causing payload to be undefined and triggering a .forEach call on an undefined value within CustomTooltip. Work is ongoing to resolve this issue. During the process, login functionality became non-functional due to a “user not found” error when attempting to log in as admin, which is being addressed before continuing further with the assigned bug. This contribution supports One Community’s goal of open sourcing sustainable civilization development.

Meenashi updated the Dropbox App Folder access for development users from “Only You” to 1/500, enabling the app to connect and retrieve the authorization code. Using this code, the refresh token was generated and stored, and file uploads using the token are functioning as expected. Environment variables were configured for refresh_token, client_id, and client_secret. Validation was added to restrict uploads to files under 5MB and only allow .doc, .docx, .pdf, .jpeg, and .png formats. The job form was added for some entries, and previously missing jobForms in Adreplies were restored after identifying that they had been deleted unexpectedly. This contribution supports One Community’s mission of open sourcing sustainable civilization development.

Rahul focused on resolving merge conflicts in PR 4212, addressing repeated errors related to file names and naming conventions, and investigating issues caused by the number of files involved. The work also included reorganizing the src/Reports folder by renaming several .css files to align with the project’s .module.css requirements. In addition to development tasks, team management responsibilities were handled, including reviewing team photos, summaries, and videos, and participating in a meeting with Anne Taylor to provide guidance on ongoing issues. This work supports One Community’s commitment to open sourcing sustainable civilization development. See the Highest Good Society and Highest Good Network pages for more on how this work contributes to open sourcing sustainable civilization development. See the collage below to view the team’s work.

Expressers, Highest Good Network software, open sourcing sustainable civilization development, One Community Weekly Progress Update #662, Highest Good Network, sustainable software development, open-source collaboration, MERN Stack, MongoDB, Node.js, React.js, Express.js, volunteer management platform, project management software, ecological responsibility, team productivity software, sustainability technology

LUCKY STAR SOFTWARE DEVELOPMENT TEAM

The Lucky Star Team’s summary, covering their work on the Highest Good Network, was managed by Keerthana Chitturi (System Administrator) and Sohail Uddin Syed (Software Engineer). The team includes contributions from Abhishek Jain (Software Engineer), Aryan Rachala (Software Engineer), Chirag Bellara (Software Engineer), Durga Venkata Praveen Boppana (Software Engineer), Shashank Madan (Software Engineer), Shravya Kudlu (Software Development Engineer), Veda Bellam (Software Engineer) and Venkataramanan Venkateswaran (Software Engineer). Their work supports One Community’s goal of open sourcing sustainable civilization development through cross-functional software development and ongoing system improvements.

This week, Abhishek completed foundational infrastructure for the Code Coverage Improvement Initiative, finalizing the ClickUp board for tracking test coverage and preparing the HGNRest backend PR (#1754) for merge. While working on the frontend PR (#4114), he identified performance bottlenecks in the GitHub runners, leading to a strategic rollout plan to merge HGNRest first before proceeding. Aryan resolved an issue in the HGN Questionnaire Dashboard where team member data was not displaying, updated component logic, and refactored the Redux selector while reporting missing testing accounts and unavailable admin logins to Jae. Chirag fixed default filter selections for PR Analytics graphs, merged updates in PR 4394, and investigated Bar chart link issues. Durga added a side navigation bar in the Evaluation Results section, updated mobile and report views, converted CSS to module CSS, and prepared the analytics pull request for merging. Shashank implemented update and delete flows for intermediate tasks, added a delete modal, progress bars, and linked parent-child task progress, supporting both frontend and backend improvements.

Shravya worked on Phase 4 Class-Wide Performance Report Generation, creating a scoring system to evaluate student performance and implementing foreign key logic for accurate retrieval. Sohail completed the email threading implementation by wiring thread-related headers into Nodemailer, extending EmailHistory persistence, updating blue-square workflow calls, and adding unit and integration tests. Veda focused on frontend and backend updates for Job Posting Page Analytics, including UI alignment, dark mode text visibility, chart formatting, responsive layouts, permission logic improvements, module CSS migration, and donut chart source breakdown visualization. Venkataramanan addressed multiple frontend and backend issues, fixing a backend controller on the Total Org Summary page, optimizing profile update endpoints, resolving errors on the BM dashboard, correcting badge assignment logic, and adding a maximum entry-hour limit to the Timelog component.

Together, the Lucky Star Team’s efforts strengthen the Highest Good Network software, advancing One Community’s mission of open sourcing sustainable civilization development. Their cross-functional work improves system reliability, user experience, analytics capabilities, and developer workflows. See the Highest Good Society and Highest Good Network pages to learn more about how this work supports open sourcing sustainable civilization development. See the collage below highlighting the team’s work for the week.

Highest Good Network software, open sourcing sustainable civilization development, One Community Weekly Progress Update #662, Lucky Star team progress, Admin Team progress, Code Coverage Improvement Initiative, GitHub Actions automation, code quality enforcement, test coverage tracking, HGNRest backend updates, HighestGoodNetworkApp performance optimization, Questionnaire Dashboard fix, Redux selector refactor, API response structure, PR Analytics graphs, Bar chart analysis, Evaluation Results module, side navigation bar, module CSS conversion, analytics PR merge, frontend–backend integration, intermediate tasks, mark-as-done functionality, student progress tracking, Phase 4 report generation, class-wide performance scoring, foreign key logic, email threading implementation, Nodemailer integration, RFC 5322 messageId generation, EmailHistory persistence, upsert behavior, debugging endpoints, role-based access control, Administrator and Owner roles, Job Posting Page Analytics, dark mode UI, module CSS migration, listing and bidding dashboard, donut chart visualization, BM dashboard fixes, Total Org Summary backend correction, Assign Badge issue resolution, Timelog validation, open-source collaboration, cross-functional software development, sustainable systems engineering, backend optimization, data visualization, workflow automation, quality assurance testing, frontend performance improvement, volunteer-driven software innovation, global impact technology.

MOONFALL SOFTWARE DEVELOPMENT TEAM

The Moonfall Team’s summary, which covers their work on the Highest Good Network, was managed by Bhavpreet Singh (Software Engineer) and includes Aayush Shetty (Software Engineer), Alisha Walunj (Software Engineer), Mani Shashank Marneni (Software Engineer), Sai Krishna (Software Engineer), and Sudheesh Thuralkalmakki Dharmappa Gowda (Full Stack Developer). Their efforts advance One Community’s mission of open sourcing sustainable civilization development, promoting open-source collaboration, ecologically responsible innovation, and holistic global progress.

This week, Bhavpreet worked on the badge system by setting up its initial structure, updating the controller to improve error handling, and refining two frontend areas through style updates and interface adjustments while coordinating progress across the team. Sai continued enhancing the project details table in the bmdashboard by adding column-level search inputs, integrating sort controls with visual indicators, and reviewing the code that manages date handling in the utilisation chart. Sudheesh completed the Phase 4 Student Profile page by adding the portfolio button within the Educational Progress view, resolved conflicts, pushed the changes for review, updated the Material Utilization Ratio chart, and began reviewing the requirement for column-level tooltips on the Daily Equipment Log page, contributing to ongoing development aligned with open sourcing sustainable civilization development.

Alisha worked on the Collaborative Lesson Plan module by configuring the topic selector, adding a search bar for subject atoms, adjusting layout elements, and preparing the Knowledge Evolution View integration by adding constants, API configurations, and data after identifying gaps in the database. Aayush progressed the Phase 2 Lessons Learned task by identifying the cause of a ghost bar graph when no data was present, updating related files in a new branch, resolving conflicts, and continuing the dark mode updates for the Building and Inventory Dashboard. Their combined efforts align with open sourcing sustainable civilization development.

Mani focused on the Phase 3 error-handling task by adding email validation aligned with RFC 5322 rules, implementing event capacity checks with a full-event indicator, building dynamic filters for Type, Location, and Date, and adding clear required-field messages across the form. Visit the Highest Good Society and Highest Good Network pages for more on how this work supports open sourcing sustainable civilization development through open-source development and globally accessible resources. The collage below presents the main contributions made by the team this week.

Team Moonfall, Highest Good Network, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, HGN Software Development, badge system structure and controller updates, BM Dashboard project-table search and sorting enhancements, Phase 4 Student Profile page portfolio integration, Material Utilization Ratio chart conflict resolution and review updates, Daily Equipment Log column-tooltip requirement analysis, Collaborative Lesson Plan topic selection, subject atom search, and layout updates, Learner Knowledge Evolution View backend-data injection and integration checks, Phase 2 Lessons Learned ghost-bar fix investigation, Building and Inventory Dashboard dark mode implementation, and Phase 3 error-handling upgrades including email validation, event capacity controls, and real-time event filtering.

REACTONAUTS SOFTWARE DEVELOPMENT TEAM

The Reactonauts Team’s summary, covering their work on the Highest Good Network, was managed by Sai Suraj Matta Veera Venkata (Business Data Analyst) and Akshay Jayaram (Software Engineer). The team includes Aseem Deshmukh (Software Developer), Diya Wadhwani (Software Developer), Guna Pranith Reddy Cheelam (Software Developer), Kristin Dingchuan Hu (Software Engineer), Namitha Vijaykumar Pawar (Software Engineer), Peterson Rodrigues dos Santos (Full Stack Developer), Siva Putti (Software Engineer), Sri Satya Venkatasai Siri Sudheeksha Vavila (Software Engineer), Suparshwa Patil (Software Engineer), Tom Linn (Software Engineer), and Ujjwal Baranwal (Full-stack Software Developer). The Highest Good Network software helps manage and objectively measure progress by focusing on demonstrating pioneering open sourcing sustainable civilization development. It supports social architecture, construction, production, and maintenance processes to build sustainable and thriving ecosystems.

This week, Akshay completed the dark mode implementation for the HGN Community Portal by integrating Redux-based theme detection, converting styles to CSS modules, resolving selector specificity issues, and updating layouts for headers, sidebars, and event cards to ensure proper responsiveness within the Bootstrap grid. His contributions also align with open sourcing sustainable civilization development by improving the accessibility and usability of shared interface components. Aseem fixed a state handling issue in the custom date filter for job applicant graphs, added reset functionality when switching filters, and opened frontend PR 4426 while troubleshooting a data-fetching error on the Average Weekly Hours graph.

Diya improved Blue Square email ordering logic by introducing batching, reducing redundant queries, and verifying performance with test cohorts; she also reworked the User Profile → Projects tab to apply immediate updates for assignments and deletions, preparing similar improvements for the Tasks module. These efforts collectively support One Community’s open sourcing sustainable civilization development goals. Guna refined PR 3999 for the listings home page, ensuring tab and image fixes met review standards, and continued work on resolving the “Page not Found” issue for the community portal’s activity attendance log. Kristin added hover effects to the Community Portal calendar, created tooltips, removed duplicate selectors, opened frontend PR 4413, and began backend work to add dynamic event status and integrate real data into the calendar.

Namitha enhanced the ComparePieChart feature on the Listing and Bidding Dashboard (PR 4436) by adding absolute values, external percentage labels, total metrics, filter options, category groupings, and responsive layout adjustments. Peterson improved the Teams page modal (PR 4417) by adding a loading spinner during user addition to prevent duplicate submissions. Siva enhanced the Activity Agenda feature by implementing dynamic routing with activityId, integrating backend APIs, and improving UI structure and styling in PR 4434. Sudheeksha spent 20 hours resolving CreateNewTeam redirect issues, implementing dark mode for the HGN Skills page, and completing fixes to ensure correct team creation flow and interface functionality. This work contributes to open sourcing sustainable civilization development.

Suparshwa refined chatbot prompts to ensure model responses are restricted to provided document data and began developing an orchestration layer to manage chat memory. Tom worked on PR 4440 to add a validation message in the Activities List calendar, informing users that past date selections are unsupported. Ujjwal continued developing update functionalities for Material Name and Measurement Unit fields in the BMDashboard Materials section, creating the API but encountering database access issues that prevented full testing. See the Highest Good Network and Highest Good Society pages to learn more about how this work supports modeling pioneering open sourcing sustainable civilization development. See below for the work done on demonstrating pioneering open sourcing sustainable civilization development.

Reactonauts, Highest Good Network Software, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, dark mode community portal, Redux theme detection, custom date filter UI, Blue Square email batching, listings home page review fixes, Community Portal calendar hover effects, Listing and Bidding Dashboard charts, Teams page loading spinner, Activity Agenda dynamic routing, BMDashboard material update functionality

SKYE SOFTWARE DEVELOPMENT TEAM

The Skye Team’s summary, covering their work on the Highest Good Network, was managed by Sayantan Paul (Frontend Tester and Software Team Administrator) and Anthony Weathers (Software Engineer). The team includes Julia Ha (Software Engineer), Lavanya Lahari Nandipati (Software Developer) and Marcus Yi (Software Engineer). The Highest Good Network software objectively tracks and manages progress, with a focus on open sourcing sustainable civilization development. It supports social architecture, construction, production, and maintenance processes that foster sustainable and thriving ecosystems. Designed to be portable, scalable, this solution is ideal for off-grid living communities – a practical example of open sourcing sustainable civilization development.

This week, Julia resolved conflicts in pull requests PR#1767, PR#4150, and PR#4268, refactored the code in PR#4150 to reduce duplicated logic and remove redundant CSS lines, and investigated a backend incident in which she identified that all user data had been deleted. Lavanya prepared and tested badge-related changes across the HGNRest backend and HighestGoodNetworkApp frontend, identified the correct branches for the related pull requests, aligned both environments and resolved Node version mismatches. She examined the backend startup process, addressed MongoDB connection failures caused by missing environment variables, verified the local database configuration and updated project files so the server could establish a valid connection. As part of this process, she contributed to open sourcing sustainable civilization development by ensuring backend and frontend alignment. Additionally, she reviewed the API behavior needed for testing blue square and badge features, confirmed frontend-backend compatibility and validated routes and notification count once the environment was configured. Finally, Lavanya confirmed the backend server started on the correct port, ensured the frontend pointed to the local API endpoint, and completed functional testing after resolving configuration issues. These efforts support One Community’s mission of open sourcing sustainable civilization development.

Marcus reviewed Facebook’s documentation, analyzed the requirements for connecting the current wireframe to Facebook’s API and researched the steps needed for implementation. Anthony attempted to resolve merge conflicts for PR#3600 and PR#1447, addressed the missed CSS file in PR#3600 that needed conversion to a module.css file and adjusted his approach on PR#1447 after identifying that the process for resetting or saving permission changes was moved into a separate function. He completed the merge conflicts and required updates for PR#3713 and PR#1504, fixed styling issues from the module.css transition and ensured that clicking the badge icon cleared the badge notification. Anthony further coordinated the investigation on the warning trackers from PR#3978 and PR#1682 that had caused profile buttons to appear incorrectly in production. He advised adding the necessary warnings and values to resolve the issue. See the Highest Good Society and Highest Good Network pages for more on how this contribution advances One Community’s goals of open sourcing sustainable civilization development in the Highest Good Network open source hub. See the collage below for the team’s work.

Highest Good Network Software, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, merge conflict resolution, backend data incident investigation, badge feature testing, MongoDB environment configuration, blue square API validation, Facebook API integration research, module.css styling updates, permission reset functionality, wireframe implementation planning, notification system debugging

SOFTWARE PR REVIEW TEAM A-N

The PR Review Team’s summary for members with names starting A–N, managed by Neeharika Kamireddy (Data Analyst), highlights their contributions to the Highest Good Network software. This platform forms the foundation for measuring our results in open sourcing sustainable civilization development. Active team members included Abdelmounaim Lallouache (Software Developer), Bhanu Anish Akkineni (Software Engineer), Carl Bebli (Software Developer), Nahiyan Ahmed (Full Stack Software Developer), and Nathan Hoffman (Software Engineer). They supported the project by reviewing all pull requests shared this week. Learn more about how the Highest Good Network tracks progress toward open sourcing sustainable civilization development in the Highest Good Network open source hub. The collage below showcases a compilation of this team’s work.

PR, Highest Good Network Software, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update #662, pull request, PR review, PR review team, software team, software development, Highest Good Network, Highest Good society, One Community, MERN Stack, software engineering, MongoDB, React.js, Node.js, Express.js, open source software

SOFTWARE PR REVIEW TEAM O-Z

The PR Review Team’s summary for team members with names starting from O–Z, covering their work on the Highest Good Network software, was managed by Jaiwanth Reddy Adavalli (Software Project Manager). The Highest Good Network software is a foundation for measuring our results in open sourcing sustainable civilization development. This week’s active members of this team were: Raghavender Reddy (Software Engineer), Sundar Machani (Software Engineer), and Yiyun Tan (Software Engineer). They reviewed all the Highest Good Network PRs (Pull Requests) shared in this week’s update. Learn more about how the Highest Good Network measures progress towards open sourcing sustainable civilization development in the Highest Good Network open source hub. The collage below shows a compilation of the work from this team.

PR, Highest Good Network Software, Open Sourcing Sustainable Civilization Development, One Community Weekly Progress Update 662, pull request, PR review, PR review team, software team, software development, Highest Good Network, Highest Good society, One Community, MERN Stack, software engineering, Use MongoDB, React.js, Node.js, Express.js, open source software

 

AND WE PRODUCED THIS WEEKLY UPDATES BLOG – CLICK HERE TO SUBSCRIBE

 

FOLLOW ONE COMMUNITY’S PROGRESS (click icons for our pages)

One Community, YoutubeOne Community, LinkedInOne Community, TwitterOne Community, Facebook, UpdatesOne Community, Facebook, GroupsOne Community, Facebook, FansInstagram, Instagram icon, Instagram posts, One Community's Instagram Page, One Community Global images, Highest Good Living, green living, eco-livingOne Community, PinterestOne Community, Weekly, Progress, Updates, BlogOne Community. Tumblr

 

 

INVESTOR PAGES

OVERVIEW | LOCATION | FUNDING

 

GET INVOLVED

DONATE | WAYS ANYONE CAN HELP | MEMBERSHIP

CLICK HERE FOR ALL PAST UPDATES

Comments are closed.