Helping One Community header, One Community Get Involved, Ways to Help One Community, Ways to improve the world, a world that works for everyone, making a difference in the world, helping world change, facilitation change, positive change, Global Transformation, Making a Difference, One Community Overview, One Community get started, joining One Community, One Community, Sustainable Community, Green Living, open source sustainability, eco-sustainability, Highest Good food, Highest Good housing, Highest Good energy, eco-community, Highest Good society, Highest Good economics, Highest Good for All, Highest Good of All, For The Highest Good, Duplicable City Center, Earthbag Village, Straw Bale Village, Cob Village, Compressed Earth Block Village, Shipping Container Village, Recycled Materials Village, Tree House Village, sustainable village, sustainable homes, intentional community, One Community Global, sustainability nonprofit, open source community, open source best practice, open source housing, open source energy, open source food, open source economics, community living, model community, making a difference, A New Way to Live, I new living model, sustainable living, eco-living

Highest Good Society

Highest Good society® is a social construct for cooperation, collaboration, and positive global change. The foundations of this are both social and emotional and this page links to the open source components most important to establishing this. The sections of this page are:

HIGHEST GOOD SOCIETY® SEARCH ENGINE

Highest Good Hub

Your search returned the following result(s)


 

WHAT IS A HIGHEST GOOD SOCIETY®

One Community’s definition of Highest Good society is the combination of all of the elements we consider foundational to supporting people living for The Highest Good of All. It is a social architecture built on three things: helping each other and others, fulfilled living and emotional sustainability, and making a difference in the world by setting an example. Its purpose is forward global movement of self-propagating teacher/demonstration communities, villages, and cities (we’re starting with the Earthbag Village and Duplicable City Center) by specifically catering to the 6-foundational emotional needs with duplicable components that address the foundations of education, social injustice and inequality, crime, economics and poverty, discrimination, emotional health, and happiness.

One community, One community global, Highest Good Society, emotional sustainability, social architecture, fulfilled living, self-propagating communities, duplicable solutions, humanitarian social model, global transformation, sustainable living, collaborative resource hub, open source community model, highest good living, altruistic social change, teacher demonstration communities, Earthbag Village, Duplicable City Center, positive global change, addressing social inequality, emotional health and happiness, sustainable social model

Click to Enlarge

One Community Highest Good Society

Highest Good Society Overview – Click to Enlarge in a New Window

 

WHY A HIGHEST GOOD SOCIETY®

a new way to life, living fulfilled, an enriching life, enriched life, fulfilled life, ascension, evolving consciousness, loving lifeWe think philanthropy and humanitarianism for purely altruistic reasons isn’t working sufficiently. Our approach to addressing this is creating a social model that provides specific benefits most people want while simultaneously and comprehensively addressing the most pressing problems humanity is currently struggling with. By coupling solutions to these problems with what most people will consider a significantly better way of living, we create a model that pinpoints the very roots of our socio-economic challenges while teaching others how to address these challenges too. In this way, Highest Good society provides the global value and individual value necessary to build the wide-spread mainstream support (including financial involvement) capable of positive and permanent transformation on a global scale.

Why Global Sustainability Now
 

WAYS TO CONTRIBUTE TO EVOLVING THIS SUSTAINABILITY COMPONENT WITH US

SUGGESTIONS | CONSULTING | MEMBERSHIP | OTHER OPTIONS

 

CLICK THESE ICONS TO JOIN US THROUGH SOCIAL MEDIA

One Community, YoutubeOne Community, LinkedInOne Community, TwitterOne Community, Facebook, UpdatesOne Community, Facebook, GroupsOne Community, Facebook, FansInstagram, Instagram icon, Instagram posts, One Community's Instagram Page, One Community Global images, Highest Good Living, green living, eco-livingOne Community, PinterestOne Community, Weekly, Progress, Updates, BlogOne Community. Tumblr

 

 

HIGHEST GOOD SOCIETY® OPEN SOURCE PORTAL

project management software, open source software, teacher/demonstration village, objective fulfilled living, data gathering for The Highest Good, transforming the planet, global collaboration, working together, tangible time, One Community, ACE Application Open Source Hub, Open Source ACE, ACE ApplicationHighest Good society is a comprehensive approach to living and creating for The Highest Good of All. Open source and free-sharing the components of Highest Good society is purposed to provide what is necessary for people to create a more fulfilling, enriching, and fun way of living that helps them while they help others. We see this as essential for spreading self-sufficient and self-propagating teacher/demonstration communities, villages, and cities to be built around the world. The initial Highest Good society areas One Community is focused on open source sharing include:

The One Community Pledge, commitment to world change, positive impact, making a difference, living for the Highest Good of All, global transformation, positive change, pledging to make a difference, One Community, One Community Global, global change, building a bridge between pragmatism and idealismOur Pledge
spacerTransformation Methodology, Highest Good Society, transforming the global environment, transformational change, evolving living, One Community, One Community Global, creating a new world, the solution to everything, the solution to everything, the solution to anything, creating world change, open source future, for The Highest Good of All, a world that works for everyone, world change, transforming the planet, difference makers, sustainability non-profit, solution based thinking, being the change we want to see in the world, making a difference, sustainable planet, global cooperative, 501c3 sustainability, creating our future, architects of the future, engineers of the future, sustainable civilization, a new civilization, a new way to live, ecological world, people working together, Highest Good food, Highest Good energy, Highest Good housing, Highest Good education, Highest Good societyGlobal transformation
One Community first five years, eco-communities, teacher/demonstration hub, green living, sustainable communities, One Community Global, ecological living, self-sufficient living, sustainable food, sustainable housing, sustainable energy, open source ecology, New World living, One CommunityProjecting our first 5 years of development
open source strategy, open source, open source sustainability, open source world, free sharing, creative commons, forwarding innovation, sharing, collaboration, cooperation, sustainable communities, teacher demonstration hubs, One Community Global, One Community, green living, Highest Good food, Highest Good housing, Highest Good economics, Highest Good society, Highest Good living, Highest Good lifestyles, Highest Good for All, open source, open source sustainability, open source worldOpen sourcing complete cities
fulfilled living model, Highest Good Society, a new way to life, living fulfilled, an enriching life, enriched life, fulfilled life, ascension, evolving consciousness, loving life, One Community, sustainable living, emotional sustainability, enriched living, living the good life, community livingFulfilled and enriched living model
foundational human needs, human needs icon, foundations of fulfillment icon, happy people, creating happinessMeeting foundational human needs
One Community school, One Community education, teaching strategies for life, curriculum for life, One Community, transformational education, open source education, free-shared education, eco-education, curriculum for life, strategies of leadership, the ultimate classroom, teaching tools for life, for the highest good of all, Waldorf, Study Technology, Study Tech, Montessori, Reggio, 8 Intelligences, Bloom's Taxonomy, Orff, our children are our future, the future of kids, One Community kids, One Community families, education for life, transformational livingFree-shared education model for all ages
Highest Good Technology and InnovationHighest Good innovation and technology
Highest Good Living icon for Highest Good Society page, Highest Good Lifestyle Considerations Page, Highest Good Materials, Highest Good Cleaning Supplies, Highest Good Lifestyle Practices, Highest Good Toiletries, Highest Good Technology, Highest Good Hardware, One Community, Highest Good SocietyHighest Good living and lifestyle considerations
consensus governing, conscious governing, enlightened governing, consensus for groups, achieving consensus, operating consensusLarge-scale consensus – covering groups as large as 1,700 people
social equality and justice, celebrating diversity, diversity as a value, celebrating diversitySocial equality and diversity as an engine of global change
community contribution, a new way of living, time as your only currency, transforming life as we know it, Highest Good SocietyA community contribution model that replaces traditional jobs
developing true community, True Community, how to build community, facilitating global community, community building, for The Highest Good of All, One Community, a new way to live, a new way of living, open source world, creating world change, One Community, 40+ tips for community making, One Community, Highest Good SocietyA model for building, maintaining, and evolving True Community
open source social media strategy icon, One Community social media, FaceBook, GooglePlus, Twitter, LinkedIn, Tumblr, YouTube, Pinterest, StumbleUpon, Blogger, Likes, Shares, world-change social media, making a difference, free annual social media strategy, One Community on the webOpen source and replicable world-change annual social media strategy
duplicable city center, solution based thinking, One Community, SEGO Center, city hub, recreation center, eco center, sustainable living, ecological living, green living, eco-recreation, group laundry center, for The Highest Good of AllBeautiful shared city centers for maximizing resource-efficient living
global cooperation, solutions that create solutions, global collaborationSolutions that Create Solutions: a global collaboration of teacher/demonstration hubs
rbe, resource based economy, asset based economy, sharing makes sense, RBE One Community, One Community resource based economy, open source future, sustainable world, eco-future, the future of economicsEstablishing and maintenance of a resource/sharing-based economy
living and creating for The Highest Good of All, global transformation, making a difference, good for people, good for the planet, good for the economy, good for everyone, the solution to everythingLiving and creating with the consciousness for The Highest Good of All
Highest Good for-profit business, Highest Good non-profit business, open source business, One Community entrepreneurial model, making money at One Community, sustainable businessFor-profit, non-profit, and entrepreneurial models for economic independence
ACE Application, improving city efficiency, creating the world we wantObjective data on Highest Good society time utilization and allocation by individuals 
Highest Good society, fulfilled living, enriched life, enriching life, living to live, how to live an enriched life, keeping it all running, sustainable living, social architecture, fulfilled living, thriving, thrivability, emotional sustainability, the good life, a new way to liveComplete details for how each of the above elements is organized and maintained

 

ADDITIONAL HIGHEST GOOD SOCIETY® DETAILS

Highest Good society, fulfilled living, enriched life, enriching life, living to live, how to live an enriched life, keeping it all running, sustainable living, social architecture, fulfilled living, thriving, thrivability, emotional sustainability, the good life, a new way to liveHighest Good society is at its core a model for showing people how to live happier, more abundant, and more positively impactful lives through cooperation and collaboration. One Community is open source project launch-blueprinting all elements of the Highest Good society model for individual implementation while demonstrating how combining them together will:

Maintaining the success and function of all of these elements will be made possible through a community contribution model. Specifically, 35 weekly hours for each person is dedicated to everything that keeps One Community functioning and fulfilling our global change methodology and 5 hours for each person is contributed to support hosting social contribution to an architecture of enriching personal growth, recreation, and interaction. Participation in hosting and attending these events is optional and people can instead choose to contribute their 5 “social hosting hours” as regular community contribution if that is their preference.

CLICK HERE FOR THE COMMUNITY CONTRIBUTION TIME ALLOCATION OUTLINE

One community, One community global, Highest Good Society, emotional sustainability, social architecture, fulfilled living, self-propagating communities, duplicable solutions, humanitarian social model, global transformation, sustainable living, collaborative resource hub, open source community model, highest good living, altruistic social change, teacher demonstration communities, Earthbag Village, Duplicable City Center, positive global change, addressing social inequality, emotional health and happiness, sustainable social model

Click to Enlarge

for the highest good of all, global oneness, creating the future together, architects of the future, working together, global collaboration, Highest Good food, Highest Good energy, Highest Good housing, Highest Good society, Highest Good business, Highest Good living, One Community

 

STRUCTURING SOCIAL CONTRIBUTION

Highest Good society, fulfilled living, enriched life, enriching life, living to live, how to live an enriched life, keeping it all running, sustainable living, social architecture, fulfilled living, thriving, thrivability, emotional sustainability, the good life, a new way to liveBecause Highest Good society is about living and sharing happier, more abundant, and more positively impactful lives through cooperation and collaboration, the element of Highest Good society that is a social architecture of enriching personal growth, recreation, and socialization is structured around participation. For a hosted event to qualify as social contribution, it will be available to the entire community (and the public once we are hosting) with at least 5% of the community (or visitors) expressing interest and committed to participate. If less than 5% of participation for 2 events in any one period of monitoring is achieved, the activity ceases to be an option and is replaced by something different. Events times are organized by the host with the structure of the model requiring participation for continued event existence, keeping both the host and the participants accountable for the maintenance of activities.

Hosted activities that count as social contribution include: classes of any kind, exercise, meditation, spiritual or any other open gathering, reading groups, game groups, music and entertainment of any kind, and anything else open to the participation of the entire community with 5% or more people consistently involved.

Participation in all aspects of the social model is voluntary. The ideas for new activities, changes to activities, and the social structure as a whole are discussed and evolved through the consensus process. Activities are posted so everyone knows what is available and sign-in sheets are used to monitor attendance. Changes are made by the host and any activity that has been removed from the schedule due to non-participation can be re-added with a one-time commitment and participation of at least 10% of the community, then ongoing participation of at least 5%. If a social activity is cancelled due to non-attendance, the host either gathers support and hosts a new activity or uses the available hours to help where it is needed in the community. The same applies if a person chooses not to contribute to hosting classes for the social contribution structure – unused hours are filled with other community contribution aspects of the individual’s choosing.

Highest Good society, all for one and one for all, people making a difference, living for the Highest Good, creating for the Highest Good, One Community, a new way of living, sustainable civilization building, green living, helping others by helping ourselves, evolving philanthropy, evolving humanitarianism, making a difference, helping the world, helping humanity, Highest Good education, Highest Good business, Highest Good government, Highest Good self-governing, consensus governing, recreation for the greater good, helping each other, culture of personal growth, culture of contribution, contributing positively, making an impact, cooperative living, cooperative creating, abundance, thriving, One Community Global

 

SUMMARY

Highest Good society is a model for cooperative and collaborative living for The Highest Good of All. It addresses the very roots of our species’ socio-economic challenges while teaching others how to address these challenges too. By coupling solutions to global problems with what most people will consider a significantly better way of living, we create the necessary global value and individual value needed to build the wide-spread mainstream support (including financial involvement) capable of positive and permanent transformation on a global scale.

 

FREQUENTLY ANSWERED QUESTIONS

Q: I thought you were 100% open source, why is “Highest Good Society” a registered trademark?

To understand this, please read our Copyrights, Trademarks, Patents and Using them to Support Open Source and Free-sharing page.

Q: Is this a religious or spiritual philosophy?

No. It is a non-ideological approach to cooperative and collaborative living. One Community’s spiritual philosophy is also non-denominational and non-ideological. (click here to read about it)

Q: Do you consider this concept of Highest Good society as the best or only way to live?

No, our philosophy for The Highest Good of All is non-ideological and this applies to Highest Good society also. We are offering this structure and its components as an option for those who’d like to increase cooperation and collaboration in their lives in a way that benefits others too. The Highest Good society model is foundational to our organization and our global transformation approach because we believe the specific individual benefits Highest Good society provides will encourage application and implementation into the self-replicating teacher/demonstration community, village, and city model. How others choose to use any and all components of One Community, however, is the choice of those individuals and groups.

Q: I want to join One Community but I don’t agree with some of the outlined concepts of your Highest Good society approach. What does this mean for me? 

We understand that preferred living models and structures will differ greatly between different people and values systems. For this reason, we strive for transparency in all policies and/or procedures that we believe may affect a person’s decision to join One Community so that only people who truly feel One Community is a good fit for them will choose to join us.

Consider joining us as a Satellite Member (click here for the Invitation Form), consultant or partner (click here for the Consultant’s/Partner’s Page), and/or just follow our progress. We expect other communities will follow (we’re open source, you could start one!) with different views on these issues and we will happily be promoting their success also if they are part of the open source and free-sharing network of teacher/demonstration communities, villages, and cities that we are helping to create. Here are the best ways to follow our progress:

One Community, YoutubeOne Community, LinkedInOne Community, TwitterOne Community, Facebook, UpdatesOne Community, Facebook, GroupsOne Community, Facebook, FansInstagram, Instagram icon, Instagram posts, One Community's Instagram Page, One Community Global images, Highest Good Living, green living, eco-livingOne Community, PinterestOne Community, Weekly, Progress, Updates, BlogOne Community. Tumblr

 

Also, the point of One Community is to build living blueprints open source so everyone can then use them for duplication. If you feel like you’d like to see a different version of One Community, we invite you to embrace the task of working with us and using everything we’ve already created to form another iteration of this idea, with a new set of rules, and attract to this idea the people who share your values and thus like your rule sets. In so doing, providing another for The Highest Good of All option with potentially a totally different approach.

Q: Does the “5% of the community (or visitors)” mean social architecture minimum participation needs will fluctuate with the number of visitors?

No. The 5% is based on the number of permanent residents only. If visitor participation plus One Community member combined equals 5% of the permanent population, then the activity will count as social contribution.

Q: What sets One Community apart from similar projects?

One Community's open source project-launch blueprinting strategy and the fact that we are open sourcing and addressing ALL elements of society simultaneously are a combination unique to our organization. Together, these will help others duplicate what we do and create self-propagating teacher/demonstration communities, villages, and cities capable of positively impacting every single person on this planet within one generation.

Q: What sets One Community's open source goals apart from similar projects?

To our knowledge, no other project exists that is providing the comprehensive nature and detail of everything we are open source project-launch blueprinting.

Q: What is the specific One Community short-term goal?

  1. Become a world leader in global-solution information content within 6 months of moving onto the property as detailed in our open source project-launch blueprinting page.
  2. Expand within 5 years to a community of 200 full-time residents producing ongoing tools, resources, and tutorials while hosting thousands of annual visitors as outlined in our long-term vision page.
  3. Define the global-solution industry itself as an open source industry, expanding mainstream awareness, appeal, and desire for comprehensive sustainability by demonstrating and sharing a more attractive and fulfilling way of living that people can have if they desire to create it also.
  4. Teach as many people as possible to duplicate and/or evolve our global transformation model.

Q: What is the ultimate One Community long-term goal?

To transform our world into a sustainable and happier one through teacher/demonstration communities, villages, and cities to be built all over the world. We will work with these hubs as our open source partners and fellow leaders of the open source, Highest Good of All, and sustainable planet movement leading to a New Golden Age of cooperation, collaboration, innovation, creativity, sustainable living, and increased happiness for the entire human organism.

Q: How are you funding One Community?

We are still seeking funding. Please see our Funding Related Details Page.

Q: Where will One Community be located and why?

Click HERE for property details that include why we have chosen the location we have.

Q: How far is One Community in the creation process?

Visit our progress page for a regularly updated list of our accomplishments and progress. Visit our blog for our on-going mini-updates and weekly summaries of accomplishments and progress.

Q: Why not just build a small-scale prototype home or community that includes a minimum-scale revenue-generating demonstration/operation? Wouldn't this get things going faster?

This small-scale operation already exists as Airbnb. What we see as missing is a complete model for self-sufficiency that is open source and reasonably replicable. Even complete models for self-sufficiency already exist in the form of the many eco-villages out there. What none of those offer though is any sort of understanding and/or path for how average people can replicate them. We also think there isn't enough of a compelling reason for most people to bother with changing how they live now to engage such a path/project, so our project is purposed to provide and demonstrate that too.

From a total global-change perspective though, we think it is even more important to create a permanent example:

This is why the intended propertyvillage models, social architecture and economic focuses are all big. To support faster and broader implementation, we are also developing everything so it is modular and implementable as individual components. This will allow for anyone who doesn't desire the full teacher/demonstration hub approach to have options too, but our primary goal is to demonstrate the complete teacher/demonstration hub as easy enough, affordable enough, and attractive enough for average people with average means to want to replicate it and/or use what we provide to build their own version.

Q: If you are giving everything away through open source, how do you intend to make money?

Our model is designed to prosper specifically because we are giving everything away through open source project-launch blueprinting. We accomplish this through eco-tourism marketed with the open source infrastructure we have already created and other supported revenue streams outlined on our revenue streams page. All of this further promotes our model of spreading sustainability and actively promoting and distributing even more open source blueprints for duplication by as many people as possible.

Q: How will this help people in Third World countries and other areas that need resources most?

Using the four-phase strategy above, we wish to demonstrate building a teacher/demonstration community, village, and/or city as profitable for large investors and/or a way for small groups of people to pool what resources they have and get out of debt. We see this spreading and bringing resources to the areas that need them most because building these villages in these areas will be more affordable and easier to do with less building restrictions.

Q: How do you stop the model from being totally capitalized without the positive intent of the original model? 

We are not focused on putting limitations on the use of everything we are creating because of our open source commitment. We will, however, directly support any organization contributing specifically to open source project-launch blueprinting and operating for The Highest Good of All.

Q: Where would I find a more detailed description of how this works?

Please visit our About Us pageMethodology page, and Site Map for more comprehensive descriptions and links to complete details for every aspect of One Community.

Q: What about safety?

We consider a community of 500 people with shared goals and vision more safe than current living models. We think even a group of 50 people working together can handle any reasonable challenge. 

One Community, for The Highest Good of All, One Community Global, sustainability non-profit, architects of the future, open source

Click Image for One Community’s Purpose, Values, and Mission Page

BUTTON1