Sustainability Implementation Blueprint – One Community Weekly Progress Update #707

One Community is pioneering a sustainability implementation blueprint that reimagines how we approach food, energy, housing, education, economics, and social architecture, all working together toward fulfilled living. Built entirely by volunteers, this model is designed to be self-replicating, laying the groundwork for a global network of teacher/demonstration hubs that operate for “The Highest Good of All.” We believe real change happens when knowledge is shared, not guarded, which is why we’re open sourcing and freely sharing every part of the process. The result: a practical path toward regenerating our planet and creating a world that works for everyone.

OUR MAIN OPEN SOURCE HUBS

Click on each icon to be taken to the corresponding Highest Good hub page.

highest good food, vegan, vegetarian, omnivore, diet, food infrastructure, hoop houses, large scale garden, food forest, botanical garden, soil amendmenthighest good energy, off-grid energy, solar power, wind power, water power, energy efficiency, hydronic, electricity, power, fuel, energy storagehighest good housing, shelter, dome home, living space, eco-housing, earthbag village, straw bale village, cob village, earth block village, shipping container village, recycled and reclaimed materials village, tree house village, duplicable city centerhighest good education, school, home school, learning, teaching, teachers, learners, curriculum, lesson plans. ultimate classroomhighest good economics, trade, money, business, transactions, resource based economy, for profit, non profit, eco tourism, revenue streams, taxes, investments, debthighest good society, social architecture, fulfilled living, pledge, values, highest good lifestyle, consensus, social equality, community contribution, recreationhighest good stewardship, for the highest good of all, vision, values, solution-based thinking model, open source model, sustainability, cultural diversity, spiritual diversity, drug policy, pet policyduplicable city center, open source city hub, laundry, dining, swimming pool, hot tub, kitchen, library, game room

One Community’s physical location will forward this movement as the first of many self-replicating teacher/demonstration communities, villages, and cities to be built around the world. This is the October 5, 2026 edition (#707) of our weekly progress update detailing our team’s development and accomplishments:

 

Sustainability Implementation Blueprint
One Community Progress Update #707

Sustainability Implementation Blueprint – One Community Weekly Progress Update #707

DONATE | COLLABORATE | HELP WITH LARGE-SCALE FUNDING

CLICK HERE IF YOU’D LIKE TO RECEIVE AN EMAIL EACH WEEK WHEN WE RELEASE A NEW UPDATE

YOU CAN ALSO JOIN US THROUGH SOCIAL MEDIA

One Community, YoutubeOne Community, LinkedInOne Community, TwitterOne Community, Facebook, UpdatesOne Community, Facebook, GroupsOne Community, Facebook, FansInstagram, Instagram icon, Instagram posts, One Community's Instagram Page, One Community Global images, Highest Good Living, green living, eco-livingOne Community, PinterestOne Community, Weekly, Progress, Updates, BlogOne Community. Tumblr

 

ONE COMMUNITY WEEKLY UPDATE DETAILS

 

HIGHEST GOOD HOUSING PROGRESS

Highest Good housing, cob construction, earthbag construction, straw bale construction, earthship construction, subterranean construction, sustainable homes, eco-homesOne Community is pioneering a sustainability implementation blueprint through Highest Good housing that is artistic and beautiful, more affordable, more space efficient, lasts longer, DIY buildable, and constructed with healthy and sustainable materials:

This week, the core team continued working on the Highest Good Housing component of property research. They researched potential property locations based on One Community’s established website criteria, focusing on the Okanogan area of north-central Washington near Oroville and several ranches in Colorado, noting that the Colorado properties often have higher elevations that may limit agricultural potential. See below for some of the pictures related to this work toward pioneering sustainability implementation blueprint.

Highest Good Housing, Pioneering Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, property research, potential property locations, Okanogan Washington, Colorado ranches, elevation research, agricultural potential, climate change, sustainable community development, One Community

Devendranath Chowdary Maganti (Data Analyst) continued working on the Highest Good Housing Implementation Timeline Data Analysis Dashboard and Visualizations by reviewing the Highest Good Housing webpage, creating a timeline tracker, and developing the first draft of the dashboard for feedback. He also supported One Community administration by working on the weekly blog, reviewing teammates’ blogs, incorporating feedback, and reviewing training work for other Admin Team members. See below for some of the pictures related to this work toward pioneering sustainability implementation blueprint.

Highest Good Housing, Pioneering Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, implementation timeline, data analysis dashboard, timeline tracker, project visualization, housing development planning, dashboard development, One Community, sustainable housing

Navya Eeshani Boyapati (Web Designer) worked on Task 963: Past Aircrete Compression Testing Research: July 2021 to December 2021 Formatting Fixes by reviewing existing content, correcting formatting and spacing issues, and improving consistency and presentation. She also addressed Task 873: Update the Tools and Equipment for Open Source Construction Page by implementing requested corrections based on supervisor feedback and updating the page content and formatting. See below for some of the pictures related to this work toward pioneering sustainability implementation blueprint.

Highest Good Housing, Pioneering Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, aircrete compression testing research, open source construction, tools and equipment, webpage formatting, content updates, sustainable construction, One Community, web development

Rushikesh Tubaji (Industrial Engineer) completed the final handoff preparation for the Highest Good Housing single-dome labor-analysis template. He reviewed the workbook for formula integrity, overlapping scope, unresolved design inputs, validation statuses, and source traceability, and corrected formula gaps identified during quality review. He updated unresolved activity notes, strengthened the Sources register, clarified the distinction between One Community information, external productivity benchmarks, and internal planning assumptions, and reorganized the workbook tabs into a clearer workflow. He also expanded the START HERE and README sections with instructions for labor-planning inputs, formula-driven columns, actual labor recording, and use of the Productivity Library and Sources tabs. Rushikesh finalized the Methodology & Handoff Guide with the current model status, known design dependencies, source-registration requirements, and guidance for extending the methodology to additional Highest Good Housing components. See below for some of the pictures related to this work toward pioneering sustainability implementation blueprint.

Highest Good Housing, Pioneering Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, single dome labor analysis, construction labor planning, productivity benchmarks, labor estimation, methodology handoff, source traceability, dome construction, One Community, sustainable housing

 

DUPLICABLE CITY CENTER PROGRESS

duplicable city center, open source city hub, laundry, dining, swimming pool, hot tub, kitchen, library, game roomOne Community is pioneering a sustainability implementation blueprint through a Duplicable and Sustainable City Center that is LEED Platinum certified/Sustainable, can feed 200 people at a time, provide laundry for over 300 people, is beautiful, spacious, and saves resources, money, and space:

This week, Nidish Reddy Koppula (Mechanical Engineer) continued working on the Duplicable City Center design by refining the hydraulic elevator project report and supporting materials. He worked on page justification and document formatting to improve consistency across the report. He simplified several calculations to make the engineering content easier to follow and added additional images and graphics where needed. Nidish also updated the assembly steps to better reflect the final design and worked on project logos and other visual elements used within the documentation. This open source Duplicable City Center project contributes towards pioneering sustainability implementation blueprint. See the collage below for a snapshot of his work this week.

Nidish, Duplicable City Center Progress, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, hydraulic elevator project report, hydraulic elevator design, elevator engineering documentation, elevator assembly instructions, engineering calculation simplification, technical report formatting, elevator design graphics, engineering project documentation, elevator assembly design, technical engineering visuals

Mayank Thakur (Industrial Designer) continued working on the Duplicable City Center design. He corrected elements and assembled them in the Fusion assembly model. He cross-referenced dimensions in the cost estimation report to correct components to the right dimensions. Mayank also obtained the first-floor dormer window model and is using it to cross-reference which elements of the second floor dormer window are correct. He also moved information from the first-floor dormer window cost estimation into the Beautiful Tables template. This work involves transferring the data from one document to the other so the second floor dormer window records match the corrected model. The assembly model and the cost estimation report are being checked against each other as part of this process. This open source Duplicable City Center project contributes to pioneering sustainability implementation blueprint. See below for some of the pictures related to this work.

Mayank, Duplicable City Center Progress, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, Fusion assembly model, dormer window CAD model, first floor dormer window, second floor dormer window, construction cost estimation, CAD dimension verification, assembly model validation, dormer window component correction, cost estimation report, Beautiful Tables template

 

HIGHEST GOOD FOOD PROGRESS

sustainable food, best practice food, sustainable food systems, aquaponics, walipini, aquapini, zen aquapini, One Community, open source food, free-shared architecture, sustainable living, green living, eco living, living ecologically, for The Highest Good of All, transforming the world, grow your own food, build your own greenhouse in the ground, ground greenhouse, open source architecture, architects of the future, sustainability non-profit, 501c3 organization, sustainable life, water catchment, organic food, food anywhere, maximum food diversity, build your own farmers market, sustainability cooperative, sustainable living group, open source, sustainability nonprofit, free-shared plans, teacher/demonstration village, open source project-launch blueprinting, One Community UpdateOne Community is pioneering a sustainability implementation blueprint through Highest Good food that is more diverse, more nutritious, locally grown and sustainable, and part of our open source botanical garden model to support and share bio-diversity:

This week, Jay Nair (BIM Designer) continued helping with the Highest Good Food initiatives by enhancing the greenhouse lighting energy calculator by adding separate fields for verified PAR photon flux, controller increment, exact fixture configuration, photon distribution, and power curve data. He linked the verified PAR inputs directly to the calculation workflow and updated the calculator to perform independent energy calculations for all four seasons for each zone group, replacing the previous annual residual approach. He also strengthened validation checks to identify missing evidence, draft crop limits, invalid inputs, and insufficient supplemental DLI. In addition, Jay reviewed the Sustainability Compliance section of the documentation to prepare it for publication. This open source Highest Good Food project contributes towards pioneering sustainability implementation blueprint. See the collage below portraying the work he completed.

Jay, Highest Good Food, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, greenhouse lighting energy calculator, verified PAR photon flux, controller increment, fixture configuration, photon distribution, four-season energy calculations, validation checks, crop limits, supplemental DLI, Sustainability Compliance documentation

Shameera Musthafa (Data Analyst) continued working on the Highest Good Food report pages and related visualizations, managed the One Community Bluesky social media account by creating and publishing project updates, and supported the hiring process through interviews and evaluating candidates. She also continued supporting OC Administration and the PR Review Team by coordinating PR review workflows, reviewing work from the Admin and PR teams, and providing feedback for accuracy, clarity, and consistency. See below for some of the pictures related to this work of pioneering sustainability implementation blueprint.

Highest Good Food, Pioneering Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, PR review coordination, project visualizations, data analysis, blog content, visual collages, social media outreach, hiring support, One Community, sustainable food systems

Zoey Zou (Landscape Architect) continued working on the Highest Good Food Walipini #3 and Large-scale Aquapini projects. For Walipini #3, she revised the model based on feedback, adjusted people components and surrounding planting, updated materials, and produced additional walkthrough videos and still renders. She added a legend to the AutoCAD planting map, created a high-quality top-view planting map render, and updated the written documentation with the revised AutoCAD plan and final render images, replacing earlier images so the documentation matched the latest model and visualization. For the Large-scale Aquapini, Zoey revised the layout and pathway widths, incorporating wider routes for wheelbarrow access and narrower secondary paths for harvesting and maintenance. She also continued redesigning the planting layout to create a denser botanical-garden experience while maintaining the productive planting plan, adjusted plant heights and locations to reduce shading conflicts, refined seating areas, and developed the circulation relationships throughout the model. This open source Highest Good Food project contributes towards pioneering sustainability implementation blueprint. See the collage below for a snapshot of her work.

Zoey, Highest Good Food, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, Walipini 3 model, Large-scale Aquapini, AutoCAD planting map, planting map render, top-view render, walkthrough video, pathway width revisions, botanical garden planting layout, shading analysis, seating areas, circulation design

 

HIGHEST GOOD ENERGY PROGRESS

highest good energy, off-grid energy, solar power, wind power, water power, energy efficiency, hydronic, electricity, power, fuel, energy storageOne Community is pioneering a sustainability implementation blueprint through Highest Good energy that is more sustainable, resilient, supports self-sufficiency and includes solar, wind, hydro, and more:

This week, the core team continued reviewing the Tools and Equipment for Open Source Construction page, contributing to One Community’s Highest Good Energy initiative. They searched for and identified items that would be better represented in different sections and added comments for correction. They also identified incorrect images, spelling errors, and errors in tool descriptions and added comments where changes were needed. The core team also completed the Equipment section and continued reviewing the Tools section to identify items that would be better placed under Equipment or Materials. See the image below for a glimpse of their work contributing to One Community’s mission of creating sustainability implementation blueprint.

Core team, Highest Good Energy, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, open source construction, construction tools and equipment, construction equipment list, building materials, construction tool descriptions, sustainable construction, construction resource guide, tool categorization, equipment and materials review, One Community open source construction

Rohan Pariakar (Operations and Supply Chain Analyst) continued updating the Highest Good Energy analysis report and supporting spreadsheets for the phased community energy model. He reviewed and formatted the Step 2 energy calculation table, including equipment categories, energy values, power values, operating hours, and category totals, and incorporated the corresponding energy, power, and usage distribution charts. Rohan also reviewed the Step 2 cost analysis table covering generators, fuel storage, battery storage, equipment costs, and monthly fuel costs. For Steps 3 and 4, he updated the report presentation of the equipment-level energy calculations and category distributions, including the energy, power, and hours-of-use charts and the associated explanatory text. He linked the Step 2, Step 3, and Step 4 summary information to the report and reviewed the linked tables to ensure that the spreadsheet data was represented correctly in the document. He also continued checking the formatting of the linked tables, including category colors and the presentation of the Heating, Computers, Appliances, Lighting, and Machines classifications. See the collage below for highlights of his work towards creating sustainability implementation blueprint.

Rohan, Highest Good Energy, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, community energy model, energy analysis report, phased energy planning, energy calculation table, battery storage, generator cost analysis, fuel storage costs, energy usage distribution, sustainable community energy, off grid power planning

 

HIGHEST GOOD EDUCATION PROGRESS

One Community school, One Community education, teaching strategies for life, curriculum for life, One Community, transformational education, open source education, free-shared education, eco-education, curriculum for life, strategies of leadership, the ultimate classroom, teaching tools for life, for the highest good of all, Waldorf, Study Technology, Study Tech, Montessori, Reggio, 8 Intelligences, Bloom's Taxonomy, Orff, our children are our future, the future of kids, One Community kids, One Community families, education for life, transformational livingOne Community is pioneering a sustainability implementation blueprint through Highest Good education that is for all ages, applicable in any environment, adaptable to individual needs, far exceeds traditional education standards, and more fun for both the teachers and the students. This component of One Community is about 95% complete with only the Open Source School Licensing and Ultimate Classroom construction and assembly details remaining to be finished.

With over 8 years of work invested in the process, the sections below are all complete until we move onto the property and continue the development and open sourcing process with teachers and students – a development process that is built directly into the structure of the education program and everything else we’re creating too:

This week, Isaiah “Isa” Hernandez (Graphic Designer) continued fine-tuning final details on the spreads for The Ultimate Classroom book, including the use of their rainbow graphic in later spreads. He also recreated the graph section of the cost analysis, as the original lacked clear focal points. The recreation focused on making the information more accessible while maintaining the existing content. Lastly, Isa reformatted the table of contents. The collage below shows some of his work towards building a sustainability implementation blueprint.

Isa, The Ultimate Classroom, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, graphic design, cost analysis graphs, data visualization, report layout design, rainbow graphic design, accessible design, table of contents formatting, publication design, sustainability report design, One Community graphic design

 

HIGHEST GOOD SOCIETY PROGRESS

a new way to life, living fulfilled, an enriching life, enriched life, fulfilled life, ascension, evolving consciousness, loving lifeOne Community is pioneering a sustainability implementation blueprint through a Highest Good society approach to living that is founded on fulfilled living, the study of meeting human needs, Community, and making a difference in the world:

This week, the core team completed over 41 hours of work managing volunteer work reviews, handling emails, overseeing social media accounts, supporting web development, and identifying and integrating bug fixes for the Highest Good Network. They also interviewed and onboarded new volunteer team members. Additionally, they produced and integrated the video above about pioneering sustainability implementation blueprint. The video also explores how pioneering sustainability implementation blueprint serves as a foundational element of One Community’s broader mission. The following images showcase their work.

Core Team, Highest Good Society, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, Highest Good Network, sustainability implementation blueprint, volunteer team management, One Community Global, web development support, bug fixes integration, volunteer onboarding, social media management, core team weekly update, community mission video

Adhya Rastogi (Business Analyst) continued updating the Google Ads Campaign Tracking Spreadsheet with current campaign, ad, and performance information and added traffic and measurement columns for ongoing monitoring. She worked on improving the main donation page by comparing existing donation pages, developing a proposed page structure, adding donation buttons, reviewing social media options, and proposing preset donation amounts. Adhya also reviewed GA4 data and identified relevant metrics for establishing a monthly performance baseline and measuring visitor engagement. She completed the Google Search Console setup for One Community and linked it with GA4 to support organic search analysis. Adhya also used GA4 comparison filters to examine traffic sources, investigated differences between GSC and GA4 data, and established paid and organic search baselines for future analysis. She continued Reddit activity through the PostByPurpose and One Community accounts by creating posts, commenting, and reviewing engagement. Adhya also prepared the weekly summary and organized and submitted the required reporting materials and pictures. See the collage below for highlights of her work towards pioneering sustainability implementation blueprint.

Adhya, Highest Good Society, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, Donation page optimization, pioneering sustainability implementation blueprint, Google Search Console setup, GA4 performance baseline, Google Ads Campaign Tracking, One Community Global, organic search analysis, Reddit community engagement, paid and organic search baselines, weekly summary reporting

Anagha Sunil Bharadwaj (Legal Research and AI Policy Specialist) continued her research on perpetual purpose trusts across US jurisdictions and their practical implications. She began researching team-specific AI tools used across One Community, starting with GitHub, and reviewed data retention and training terms across major AI tools at the free versus paid tiers to ground the policy’s Approved Tools section in actual terms rather than assumptions. Anagha then read the NIST AI Risk Management Framework to determine whether a single AI usage policy would be sufficient or whether department-specific terms were needed, and began related research into department-wise AI guidelines published by companies and framework organizations. She continued this research into guidance specific to structural, engineering, and safety-related content, given its relevance to One Community’s construction activities. Anagha then researched human oversight requirements for internal AI use, and identified high-risk categories requiring stricter review along with a practical verification checklist. This included research into the broader oversight mechanism needed for the policy and the process for establishing a system of checks and balances around AI use. She closed the week by collating all findings into the working document and preparing the weekly report. See the collage below for her week’s work, furthering One Community’s mission of pioneering sustainability implementation blueprint.

Anagha, Highest Good Society, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, AI usage policy, pioneering sustainability implementation blueprint, perpetual purpose trusts, NIST AI Risk Management Framework, One Community Global, human oversight requirements, AI tool data retention, department-specific AI guidelines, Legal Research and AI Policy, nonprofit AI governance

Devarsh Wali (Program Manager) continued supporting the weekly blog review process and Admin Team procedures. He worked on One Community’s AI optimization and AEO report by reviewing feedback, implementing updates and requesting a new blog for additional testing. Devarsh tested five more blogs, documented the results in the report and continued identifying videos that could be used to create training material to share with Jae. He also supported HGN software development by testing PRs and documenting findings. In addition, Devarsh completed his team’s weekly blog summary and created the team collage for publication. The images below provide examples of this week’s work towards pioneering sustainability implementation blueprint.

Devarsh, Highest Good Society, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, AEO optimization report, pioneering sustainability implementation blueprint, AI optimization strategy, blog testing results, One Community Global, HGN software testing, PR testing documentation, training video material, Admin Team review, weekly blog summary

Jin Hua (Website, AdWords, and Analytics Administrator) fixed a critical site issue. He checked sitemap and robots file after reports they looked “broken.” The sitemap itself was valid for search engines; Chrome was warning about an old way of prettifying XML in the browser, which was fixed on the server. The bigger issue was Cloudflare serving a stripped-down robots.txt that omitted the sitemap link and standard crawl rules, while WordPress looked correct in the admin. He corrected the Cloudflare setting and cleared cache, so the live robots.txt pointed to the sitemap again. The website is the foundation for sharing all open source plans for pioneering sustainability implementation blueprint. See below for images and Highest Good Network page related to this website restoration work.

Jin, Highest Good Society, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, Website sitemap fix, pioneering sustainability implementation blueprint, robots.txt correction, Cloudflare configuration, One Community Global, technical SEO, search engine crawling, WordPress site maintenance, open source sustainability plans, website restoration

Sethuraman Karunanithi (Industrial Engineer) worked on the Volunteer section of the Highest Good Network (HGN) User Manual. He used the Demo Volunteer account to go through every page, button and icon a Volunteer can reach, and took screenshots for the manual. He wrote eight chapters: Logging In, Dashboard, Timer, Profile Page, Weekly Summaries, Tasks and Timelogs, Leaderboard, and Team Locations. Each chapter covers what the page is for, how to reach it, its parts, step-by-step actions, and common problems. In addition, Sethuraman matched the layout, colors, and fonts of the existing manual. He added separate explanations for the five status bar badges and the three clock icons in Team Member Tasks. He corrected on-screen labels, a timer message, and a page address. Also, Sethuraman renumbered the section from 1 to 8 so it reads as its own document. See the collage below for this work toward pioneering sustainability implementation blueprint.

Sethu, Highest Good Society, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, Highest Good Network User Manual, pioneering sustainability implementation blueprint, Volunteer section documentation, HGN Dashboard and Timer, One Community Global, Weekly Summaries page, user manual screenshots, Team Locations, technical writing, volunteer onboarding guide

ADMINISTRATION TEAM

The Administration Team’s summary, which covers their work on the Highest Good Network, was managed by Pandithya Reddy Dasari (Business Analyst) and includes Ashmita Pal (Data Analyst), Fnu Rukmangada (Administrative Assistant), Gargi Vipat (AI Engineer), Prathik Raju (Data Analyst), Sachit Varma (Business Operations & Cost Analyst), Sai Sree Dongari (Data Analyst), Shreyas Harish (Data Engineer), and Tanmay Nihal Harwani (Data Scientist). The Administration Team supports the Highest Good Network, a tool designed to track and measure progress while creating systems that support the sustainability implementation blueprint. Through administrative support, documentation, testing, training, recruitment, analytics, and content management, the team helps advance this mission, aligning with One Community’s vision of building a replicable and sustainable future model.

This week, Ashmita tested several PRs on Dev and left comments in the Google Doc, covering the Reports page, PM Resource Dashboard, Issue Chart, and the new All Inventory Types page in the BM Dashboard. She found that the Projects page search does not return valid project names and that the Utilization Chart date filters do not display properly in dark mode. Ashmita also went through older pending PRs and reviewed work submitted as part of the Training Team. Fnu completed the administrative training process and obtained official administrator access to the Highest Good Network application. She created a personal testing profile in the development environment and compared the Deadline Administrator dashboard with the tutorial documentation, reporting the interface discrepancies she found to management. Their work contributes to One Community’s pioneering sustainability implementation blueprint.

Gargi updated the AI announcement and bio image tutorial based on Jae’s review feedback. She continued as a Correction Administrator by checking other admins’ corrected PDFs against the versions provided by Sara and flagging any that did not match, and she started the HGN user manual task by creating a testing account and reviewing role permissions. Pandithya completed the initial training process and began setting up frontend testing for the Highest Good Network product team. She tested HGN Phase I bugs and worked on PR #5541, PR #5538, PR #5467, and PR #5500 in the development testing environment, and created an admin account for features that require administrator-level access. Together, they supported the development of the pioneering sustainability implementation blueprint.

Prathik completed daily time log reviews for volunteers, finished the weekly Facebook and Instagram analytics, and scheduled posts for both accounts. He tested the Job Form Builder, live Application Form, and collaboration page title search, submitting three bugs, and completed the weekly blog work for Team Binary Brigade. Sachit rebuilt the funder profiles in the funding matrix using the Walton Family Foundation brief as the template. He checked current application processes, grant sizes, and contact details, updating profiles for the Hewlett Foundation, Rockefeller Brothers Fund, MacArthur Foundation, Sloan Foundation, Ford Foundation, Heising-Simons Foundation, Bezos Earth Fund, and Moore Foundation. This work supports One Community’s pioneering sustainability implementation blueprint.

Sai Sree organized review images, created collages, finalized blog content for the PR Admin Team, and updated the Social Media Master Dashboard. Her frontend testing covered chart updates, dark mode functionality, page layouts, and responsive behavior, and she identified issues with chart filtering, legend display, and data restoration. Shreyas supported the Training Team under OC Administration by reviewing the Google document for Alpha Team members and writing the team summary for the weekly blog. He also assigned tasks to volunteers who requested hours, tested sections of the Total Organization Summary dashboard, created an AI training manual, and left feedback for a developer on a PR that did not work as expected. Tanmay continued bio management, blog preparation, and social media tasks. He updated existing bios, followed up with team members on missing summaries and photographs, organized content from multiple team blogs into the weekly blog, and completed required SEO updates. He also published Threads posts and completed final testing of merged PRs, contributing to One Community’s pioneering sustainability implementation blueprint. See the collage below for highlights and a visual overview of this week’s work.

Admin Team, Highest Good Network, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, Highest Good Network, frontend software testing, pull request testing, administrative training, dashboard testing, bug tracking, social media analytics, user manual documentation, volunteer management, Sustainability Implementation Blueprint

 

HIGHEST GOOD NETWORK PROGRESS

Highest Good Network® Application, improving city efficiency, creating the world we wantOne Community is pioneering a sustainability implementation blueprint through open source Highest Good Network® software that is a web-based application for collaboration, time tracking, and objective data collection. The purpose of the Highest Good Network is to provide software for internal operations and external cooperation. It is being designed for global use in support of the different countries and communities replicating the One Community sustainable village models and related components.

  • Learn about our open source community collaboration, management software, and sustainability implementation blueprint: The Highest Good Network

This week, the core team continued HGN PR testing on the Main branch for the Highest Good Network, a platform pioneering sustainability implementation blueprint, and confirmed 10 PRs as fixed. The following issues were not fixed: three bugs on the Projects page (PR #3929); E2E testing and launch of the Blog Publishing and Mailing Component (PR #5464); dark mode implementation for the Utilization Chart (PR #5485); and displaying the Community Members List for an event with details on the Engagement page (PR #4699). They were also unable to test 5 PRs because there was no data available on the Main branch and confirmed fixes for dark mode issues on 2 pages. See the collage below to view the team’s work.

Core Team, Highest Good Network, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, Highest Good Network, sustainability implementation blueprint, HGN pull request testing, One Community Global, software QA testing, GitHub pull requests, Dark Mode fixes, Blog Publishing and Mailing Component, Utilization Chart, core team weekly update

ALPHA SOFTWARE DEVELOPMENT TEAM

The Alpha Team’s summary, covering their work on the Highest Good Network, was managed by Lin Khant Htel (Frontend Software Developer), with a team consisting of Deepigha Japamony (Software Engineer), Devang Saraogi (Software Engineer), Maithili Kalkar (Software Engineer), Priyanka Ajit Mutha (Software Engineer), Som Ramnani (Junior Software Engineer), Sai Sandeep (Software Engineer), and Yingshu Wang (Software Engineer). Their work supported One Community’s mission of cross-functional software development and system improvements, helping advance open source permaculture communities.

This week, Lin managed and reviewed the team summary covering Deepigha, Devang, Maithili, Priyanka, Sai Sandeep, Som Ramnani, and Yingshu Wang, reviewed PR #4734 by examining the code and running tests locally, and checked Alpha team members’ weekly summaries, photos, and videos while sharing pending pull requests for team review. Deepigha developed PR #5607 to fix Wishlist page navigation by adding the correct availability route, component, styling, and Redux state lookup, and reviewed 10 pull requests, approving 6 and requesting changes on 4 over functional, styling, filtering, and dark mode issues. Devang improved the Total Org Summary PDF export in PR #5557 by fixing chart sizing, pagination, borders, and the map and anniversary sections, investigated remaining dark mode display issues, and fixed the BMDashboard Issue Log submission bug by correcting a missing project ID, adding a regression test, and opening PR #5614, supporting the goal of pioneering sustainability implementation blueprint.

Maithili continued work on the Instagram autoposter by fixing scheduled post media loading, correcting frontend and backend field mismatches, strengthening user authentication validation, retaining existing media during edits, and moving media storage to Cloudinary, along with adding tests and resolving SonarCloud issues and dependency conflicts. Priyanka implemented CSV export for the Weekly PR grading screen, added tests for CSV generation and the Export button, verified that downloaded rows reflect search and role filters, and continued investigating PR count and duplicate entry issues. Sai worked on PR #5476 to align column headers with their content, added a calendar component for loss tracking in PR #5606, and resolved merge conflicts in PR #5553, contributing to One Community’s mission of pioneering sustainability implementation blueprint.

Som resolved merge conflicts and SonarCloud warnings in PR #5435, fixed combined category and status filtering in PR #5603 with regression tests, and updated PR #4603 with an inventory sorting dropdown offering Edited and Default order options, keyboard support, and dark mode styling. Yingshu improved the Volunteer Time save modal by hiding the upper close button during saves, disabling the remaining close control, and adding accessible save-status announcements, with 21 related tests, ESLint checks, Git diff checks, and the production build passing, furthering One Community’s mission of pioneering sustainability implementation blueprint. See the collage below for highlights of this week’s work.

Alpha Team, Highest Good Network, Pioneering Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, HGN software development, Instagram autoposter Cloudinary integration, Total Org Summary PDF export, BMDashboard issue log fix, Weekly PR grading CSV export, Wishlist page navigation fix, dark mode UI accessibility, SonarCloud code quality, pull request review workflow, pioneering sustainability implementation blueprint

BINARY BRIGADE SOFTWARE DEVELOPMENT TEAM

The Team Binary Brigade’s summary, covering their work on the Highest Good Network, was managed by Roshini Seelamsetty (Software Engineer) and Prathik Raju (Data Analyst) with a team consisting of Aditya Krishnamurthi (Software Engineer), Amaan Syed (Software Engineer), Dhruv Topiwala (Full Stack Software Engineer), Mahika Kakkad (Software Engineer), Mahitha Pasupuleti (Software Engineer), Shreya Shailesh Bandodkar (Software Engineer), and Shubham Jakhete (Software Engineer) supporting One Community’s mission of cross-functional software development and system improvements. This work advances the team’s objectives, ensuring that all completed tasks directly contribute to pioneering sustainability implementation blueprint.

This week, Aditya worked on the PR Grading Dashboard by implementing reviewer removal functionality, adding backend and frontend support for deleting weekly grading records, updating week-based filtering, adding validation for reviewer and team inputs, and verifying database updates. He also investigated Volunteer Status and Mentors chart issues in the Total Org Summary dashboard, in support of the sustainability implementation blueprint. Amaan worked on frontend development, follow-up fixes, and testing across multiple HGN tasks by addressing reviewer feedback, resolving merge conflicts, updating responsive behavior, adding test coverage, validating frontend and backend integrations, and verifying functionality across light and dark modes, contributing to the sustainability implementation blueprint. Dhruv worked on blue square generation issues related to time-off requests, researched social media auto-posting options, implemented Tumblr auto-poster functionality, and addressed reviewer comments on sorting, queries, warning ID lookups, and monitor contact details, work that supports the sustainability implementation blueprint.

Mahika tested the Total Org Summary dashboard on the dev site ahead of its launch by creating test accounts and a test team, logging test hours, issuing a blue square, and deactivating a user. She found 11 bugs, checked 10 related pull requests, and wrote a report of her findings, work that advances the sustainability implementation blueprint. Mahitha worked on the Kitchen and Inventory module by updating the Garden Management page, replacing browser popups with in-page user interface components, addressing supplier validation and order issues, and developing the Orchard Management page with order tracking, planting schedules, order actions, and light and dark mode support, contributing to the sustainability implementation blueprint. Roshini completed PR #5591 by updating the Weekly Summaries submission page layout, addressing spacing and formatting issues, and aligning page elements according to requirements. She also resolved merge conflicts for PR #2181 and made updates for PR #5477, in support of the sustainability implementation blueprint.

Shreya tested the HGN Software Team Questionnaire Dashboard by validating help requests, skills overview functionality, community member search and filtering, API responses, user profile navigation, and permission configurations, and documented blockers and dependencies, work that supports the sustainability implementation blueprint. Shubham worked on Mastodon post scheduling by updating backend route registration, authentication, scheduling validation, frontend integration, dark mode behavior, and date and time handling, tested posting workflows, and raised frontend and backend pull requests, contributing to the sustainability implementation blueprint. The collage below offers a visual representation of the team’s work for the week.

Team Binary Brigade, Highest Good Network, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, PR grading dashboard, remove reviewer feature, weekly grading records, Total Org Summary charts, backend input validation, frontend follow-up fixes, reviewer feedback resolution, responsive behavior updates, frontend backend integration, light and dark mode testing, blue square generation fix, time-off request handling, Tumblr auto-poster, social media auto-posting, reviewer comment fixes, Total Org Summary testing, dev site dashboard testing, blue square test accounts, bug reporting, pull request verification, garden management page, orchard management page, kitchen inventory module, supplier validation, in-page popup components, weekly summaries submission page, page layout formatting, merge conflict resolution, pull request updates, spacing and alignment fixes, questionnaire dashboard testing, skills overview page, community member search, user profile navigation, E2E testing tracker, Mastodon post scheduling, backend route registration, scheduling validation, dark mode composer, frontend backend pull requests

DEV DYNASTY SOFTWARE DEVELOPMENT TEAM

The Dev Dynasty Team’s summary, covering their work on the Highest Good Network, was managed by Aadit Trivedi (Software Engineer and Software Team Administrator) with a team consisting of Akshay Viswanath (Software Engineer), Amaresh Chaudhary Nara (Software Engineer), Ansh Shah (Software Engineer), Bosu Babu Bade (Software Developer), Gayatri Sawant (Software Engineer), Hemanth Varupula (Software Developer), Isha Pawar (Software Engineer), Linlin Fan (Software Engineer), Mahalakshmi Mahadevan (Software Engineer), Mahathi Ganimisetti (Data Analyst), Shreevaths Karawal Satish Rao (Software Engineer), Shreyas Battula (Software Engineer), Sireesha Kunchala (Software Engineer), and Yuxuan Wang (Software Engineer), supporting One Community’s mission of cross-functional software development and system improvements. This week, Akshay confirmed the backend fix for the Task Completed chart date filter against the development database, had two frontend pull requests merged for the Volunteer Status donut chart and HGN Help modal dark mode, and opened a pull request moving three Total Org Summary charts onto one shared donut component. He traced green buttons appearing in every pop-up window to a stylesheet from a recently merged pull request, and took over a large dark mode pull request, updating it with 785 newer commits, resolving 20 merge conflicts, and fixing the remaining reviewer-reported issues. Amaresh worked on five pull requests, fixing chart overflow on PR #5470, dark mode icons and a detaching dropdown on PR #5379, and layout crashes, filter dropdowns, and the Share PDF export on PR #5415, and opened backend PR #2381 to connect unused tool availability logic to its routes with full test coverage, contributing to the sustainability implementation blueprint.

Ansh tested PR #5576 for Team Page responsiveness, PR #5600 for the Weekly Summaries Report week-off notification, and PR #5607 for the Wishlist Availability route, and continued the Dev Header Edit Lock and History Tracking feature, designed to limit header editing to Owner-level users. Bosu added an optional reason when an account is changed from Rehireable to Not Rehireable on the Profile Page, storing it in the backend profile model, showing it on hover, and adding regression tests that pass 20 of 20 on the frontend and 11 of 11 on the backend, and he identified a remaining issue where the indicator resets after a page reload. Gayatri added a Requested Week Off notification to the Weekly Summaries Report in PR #5600, moving it beside the team code after review, and fixed the Equipment list update button in PR #5605 with backend PR #2379 so equipment status fields save and display correctly, work that supports the sustainability implementation blueprint.

Hemanth updated PR #5592 for the Most Wasted Materials bar graph in response to reviewer suggestions, adding dark mode support, and traced the cause of the issue in PR #5064 to a missing backend API endpoint. Isha completed Material Consumption Graph enhancements in PRs #4587 and #1957, the expired team code fix in PR #5597, equipment upload status and network failure handling in PRs #4999 and #2103, and Resolved and Closed Task Tracking in PRs #4797 and #2031, each verified with its test suites. Linlin fixed badge management text contrast in dark mode on PR #5529, added a Suspense boundary for team locations on PR #5601, scoped scrollbars to dark mode on PR #5503, and aligned the People Report sidebar cards with expandable legends on PR #5524, advancing the sustainability implementation blueprint.

Mahalakshmi raised PR #5599 to add a Rental Tracking option to the Total Construction Dashboard and began end-to-end testing of the PR Review Team Admin and Analytics Dashboard, creating a tracker of merged tasks to verify. Mahathi traced Supplier Performance, Tools by Availability, and Tools Stoppage filters through the API, controllers, and MongoDB data, restored project-name mapping and missing visualizations, and connected placeholder backend routes to their controllers. Shreevaths fixed the Insights Widget on PR #5618, sorting and recoloring the life strategy bars, correcting dark mode colors and decimal values on the summary cards, adding accessibility labels, and adding 17 test cases. These analytics and dashboard improvements contribute to the sustainability implementation blueprint.

Shreyas improved the User Profile team creation workflow so new teams are saved and immediately assignable without duplicates, matched team codes case-insensitively against current codes, preserved team assignments for inactive teams when editing titles, and improved autocomplete accessibility. Sireesha mapped administrative and management job titles to their correct application forms, added KPI tile tooltips and a mobile layout, and fixed the bulk Mark as Hold action in PR #4680 with a backend ObjectId fix. Yuxuan completed her onboarding announcement and bio and continued fixing the Hours by Team Member visualization on the Projects Reports page after reviewer feedback. Their work supports the sustainability implementation blueprint. The collage below offers a visual representation of the team’s work for the week.

Team Dev Dynasty, Highest Good Network Software, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, software development, pull request reviews, frontend testing, backend APIs, dark mode fixes, dashboard analytics, One Community

SKYE SOFTWARE DEVELOPMENT TEAM

The Skye Team’s summary, covering their work on the Highest Good Network, was managed by Ken Zou (Software Engineer), with a team consisting of Jaden Wong (Software Engineer), Purav Patel (Software Engineer), and Swathi Angadi (Software Engineer), supporting One Community’s mission of cross-functional software development and system improvements. This work advances the team’s objectives and supports One Community’s work in pioneering sustainability implementation blueprint.

This week, Ken resolved the permissions management follow-up ticket by confirming that permission changes automatically refresh the log table and use the frontend permission name while confirming that the reported blank log records could not be reproduced. He also reviewed PRs #4272 and #1843 for the Issues Created vs. Resolved graph, identifying backend date range and weekly bucket issues, missing KPI tooltips, mobile layout problems and dark mode styling issues. Ken reviewed PRs #4714 and #2005 for the Facebook autoposter workflow, confirming the main connection, posting, scheduling and history functionality while documenting questions around timezone handling, Page switching, logout behavior, connectedBy values and Meta configuration. He also reviewed PRs #3906 and #1357 for the Cost Breakdown by Type of Expenditure line graph, further supporting pioneering sustainability implementation blueprint.

Jaden traced and fixed missing posted dates on multiple Collaboration page job listings by identifying a backend updateJob controller issue that allowed falsy datePosted values to overwrite valid dates. He updated the controller, added a mechanism to restore missing dates, created a script to repair legacy records and expanded tests for the update logic and backfill process. Jaden also improved category to image matching, resolved eight asynchronous reliability findings, handled a merge conflict involving a deprecated feature and verified the final changes through linting, testing and manual inspection, furthering One Community’s mission of pioneering sustainability implementation blueprint.

Purav continued closing out the Job Applications launch work across the remaining frontend and backend PRs. He updated PR #5536 with the latest development branch, preserved the use of both filters tooltip behavior and re-ran the related tests. Purav addressed reviewer feedback on PR #5544 by updating the job title mismatch warning, removing the duplicate ToastContainer, fixing Sonar reliability findings and cleaning the commit history. He also verified that PRs #5538 and #5541 remained compatible with the latest development code and completed backend closeout work for PR #2344 by tracing submitted application data through the job form response endpoint and confirming how applications and analytics are currently accessed contributing to One Community’s mission of pioneering sustainability implementation blueprint.

Swathi investigated the disappearing Edit to Reorder button, identified permissions as the root cause and created a video explaining the issue for reviewers. She also updated Promotion button functionality based on reviewer feedback, resolved new SonarQube issues and began Dark Mode changes for the PR Team Analytics Dashboard. These activities continued advancing the team’s work in pioneering sustainability implementation blueprint. Check the image collage below for a visual overview of the Skye Team’s work for the week.

Team Skye, Highest Good Network, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, #TeamSkye, #HighestGoodNetwork, #SustainabilityImplementationBlueprint, #OneCommunity, #WeeklyProgressUpdate707, #OpenSourceSoftware, #SoftwareDevelopment, #ProductTesting, #SustainableTechnology, #SustainabilityImplementation

SOFTWARE PR REVIEW TEAM A-N

The PR Review Team’s summary for members with names starting with A–N was managed by Sai Sree Dongari (Data Analyst). The Highest Good Network is a foundation for measuring our results and advancing the sustainability implementation blueprint. This week’s active members of this team were Aadit Trivedi (Software Quality Assurance & Team Coordinator), Aakash Vidiyala (Software Engineer), Aarya Amit Shah (Software Engineer), Aditya Varun Dhayapulay (Software Engineer), Carl Bebli (Software Developer), Mallikharjuna Abhiram Mulpuri (Software Engineer), Manav Kheni (Software Developer), and Nathan Hoffman (Software Engineer). They reviewed all Highest Good Network PRs shared in this week’s update. Learn more about how the Highest Good Network open source hub measures progress toward pioneering sustainability implementation blueprint. The collage below shows a compilation of this team’s work.

Highest Good Network Software, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, pull request, PR review, PR review team, software team, software development, Highest Good Network, Highest Good society, One Community, MERN Stack, software engineering, MongoDB, React.js, Node.js, Express.js, open source software

SOFTWARE PR REVIEW TEAM O-Z

The PR Review Team’s summary for members with names starting with O–Z was managed by Shameera Musthafa (Data Analyst). The Highest Good Network Software is a foundation for measuring our results in sustainability implementation blueprint. This week’s active members of this team were Sundar Machani (Software Engineer) and Yiyun Tan (Software Engineer). They reviewed all the Highest Good Network PRs (Pull Requests) shared in this week’s update. Learn more about how the Highest Good Network open source hub measures progress towards our goal of sustainability implementation blueprint. The collage below shows a compilation of the work from this team.

PR Review Team, Highest Good Network Software, Sustainability Implementation Blueprint, One Community Weekly Progress Update #707, pull request, PR review, PR review team, software team, software development, Highest Good Network, Highest Good society, One Community, MERN Stack, software engineering, MongoDB, React.js, Node.js, Express.js, open source software

 

AND WE PRODUCED THIS WEEKLY UPDATES BLOG – CLICK HERE TO SUBSCRIBE

 

FOLLOW ONE COMMUNITY’S PROGRESS (click icons for our pages)

One Community, YoutubeOne Community, LinkedInOne Community, TwitterOne Community, Facebook, UpdatesOne Community, Facebook, GroupsOne Community, Facebook, FansInstagram, Instagram icon, Instagram posts, One Community's Instagram Page, One Community Global images, Highest Good Living, green living, eco-livingOne Community, PinterestOne Community, Weekly, Progress, Updates, BlogOne Community. Tumblr

 

 

INVESTOR PAGES

OVERVIEW | LOCATION | FUNDING

 

GET INVOLVED

DONATE | WAYS ANYONE CAN HELP | MEMBERSHIP

CLICK HERE FOR ALL PAST UPDATES

Comments are closed.